BDC

Search
BDC Magazine

part l

Latest Issue

BDC 319 : Aug 2024

part l

Part L changes likely to prompt surge in UKCA testing demand for door and window fabricators

Incoming changes to Part L of the Building Regulations are likely to intensify testing demand in the run up to the December 31 deadline for UKCA certification. The warning, from Element Materials Technology – one of the UK’s leading testing and certification service providers to the construction industry – comes in advance of scheduled changes to Part L, which take effect from 15 June. As part of a shift towards lowering domestic CO2 production through the Future Building Standard, all new doors and windows entering the market from that date must meet new mandated U-values.  However, any existing products currently on the market which meet the new mandated U-values must still achieve UKCA marking in order to be sold in the UK from 1 January 2023. The requirement is likely to affect hundreds of products manufactured outside of the UK, even if they have achieved CE marking in the country of manufacture. UKCA marking can only be issued by an approved body listed on the UK government’s database. As there are only a small number of approved bodies, manufacturers who have not yet started or completed the process could find themselves under pressure to secure laboratory space with just six months left until the UKCA marking requirements come into force. Chris Bryan, Senior Test Engineer at Element Materials Technology – Wednesbury, comments: “On the surface, the changes to minimum U-values set out in the updates to Part L are straightforward. Indeed, a sizeable majority of products currently in circulation are already compliant. “The real issue is that any product that has been CE-marked in another country – even if it meets the U-value requirements set out in the changes to Part L – will need to be re-tested in the UK to achieve UKCA marking to continue being sold here from the start of next year.” Chris continues: “The realisation is really starting to take effect amongst the international fabrication community. We have already seen a surge in demand in recent weeks and only expect that to increase as we get closer to the UKCA deadline. I would strongly urge any fabricators who either manufacture overseas or are looking to meet the new requirements to book UKCA testing now to ensure a smooth transition.” To find out more about UKCA testing, please visit: https://www.element.com/product-qualification-testing-services/ukca-mark-guidance.

Read More »

Insulation specialist Actis poised to launch CPD on revised Part L regulations

Revisions to Part L of the building regulations, which come into force in June, are the subject of a new CPD devised by insulation specialist Actis which is due to be launched to the industry in a few weeks’ time. Tomorrow’s Insulation Solutions for Future Homes Standards is currently awaiting certification by the Construction CPD Certification Service and will become the fourth in Actis’ series of popular professional CPD certified training programmes. Other sessions are the RIBA-approved CPD on addressing the performance gap with reflective insulation, a CPD module on building regulation compliance and a mini training course specially designed for use at LABC roadshows on the new SAP 10. The new CPD, aimed at architects, specifiers, builders and building control officers, looks at how the changes will impact the industry and how to ensure professionals meet the targets laid down in the revised building regulations. With new build homes obliged to see carbon emissions reduced by 31% over the current levels after June 15, the Actis CPD will explain the importance of focusing on ‘fabric first’ to help achieve this goal. There will be a one-year grace period for projects currently going through the planning process. Actis UK and Ireland technical director Thomas Wiedmer explained: “In order to achieve this 31 per cent uplift over current regulations we have to focus on ensuring the fabric of the building is the main driver of energy efficiency. This will need to be combined with more use of efficient building technologies. “Energy efficiency standards should always be based on reducing the need for energy first and in particular limiting the heat loss through thermal elements – that is through achieving excellent U-values, reducing thermal bridging and improving air tightness – the fabric first principle.” The CPD will look in detail at ways to improve U-values, reduce thermal bridging, address the performance gap and improve air tightness while ensuring there are no issues with overheating. Thomas added: “Ensuring insulation is continuous, with no gaps, plays a vital role in reducing thermal bridging – and this is one area in which the Actis Hybrid range excels, with its flexible nature and ease of cutting and moulding into corners, gaps and awkward junctions.” The CPD will also look at SAP 10, the latest update to the Standard Assessment Procedure, which is incorporated within the revised Part L regulations, and which is designed to ensure correct thermal modelling junctions are used. The Part L changes are a stepping stone towards the far more stringent energy efficiency requirements for new homes to be laid down under the forthcoming Future Homes Standard, which should be in place by 2025. That in turn will play a key role in enabling the UK to meet its 2050 net zero target.  Building Design and Construction Magazine | The Home of Construction & Property News

Read More »