BDC

Search
BDC Magazine

Tech-City

London’s Tech-City Development Complete

A building in London’s Tech-City has been redeveloped in order to create 75,000 sq ft of new stand-out office and retail space. The work was delivered on Arnold House by Gilbert-Ash, with mechanical and electrical works completed by Irwin M&E. “Arnold House was a really interesting project to work on,”

Read More »

Gilbert-Ash Completes Project in Tech-City

Award-winning UK construction, refurbishment and fit out contractor, Gilbert-Ash, completed the redevelopment of Arnold House in the fast-growing ‘Tech-City’ area of London. The former warehouse now contains a 75,000 sq.ft. stand-out office and retail space. The £15 million project included a three-story extension reflecting the design of the existing building.

Read More »

Latest Issue

BDC 319 : Aug 2024

Tech-City

London’s Tech-City Development Complete

A building in London’s Tech-City has been redeveloped in order to create 75,000 sq ft of new stand-out office and retail space. The work was delivered on Arnold House by Gilbert-Ash, with mechanical and electrical works completed by Irwin M&E. “Arnold House was a really interesting project to work on,” said Matthew Bowden, Irwin M&E Contracts Manager. “Delivered under a Design and Build contract, we used 3D Autocad to design the duct work which was prefabricated off site. This allowed us to implement just-in-time delivery to site, which was important as it is located on a very busy street with restricted access. This in turn meant a quicker turnaround and installation, with no bottlenecks on supplies. It was also preferable from a Health, Safety and Quality perspective as the duct work was prefabricated in a controlled factory environment and meant that a Hot Works permit was not required on site.” Adding to the company’s success in delivering technologically advanced buildings, the project benefited from several sustainable technologies, incorporated by Arnold House. It also attained a BREEAM Very Good certification and a WiredScore Gold Certification. “The project architect BuckleyGrayYeoman, incorporated traditional-style industrial lighting fixtures which acknowledged the building’s industrial past. We procured these high-bay lights from a recycling yard and installed them as impressive feature lighting in the building’s reception,” added Matthew Bowden. Irwin M&E worked with Shoreditch Council, while also employing two apprentices on site, one Mechanical the other Electrical, for the duration of the project. The company has previously worked on the new Innovation Centre for 5G Technology at the University of Surrey.

Read More »

Gilbert-Ash Completes Project in Tech-City

Award-winning UK construction, refurbishment and fit out contractor, Gilbert-Ash, completed the redevelopment of Arnold House in the fast-growing ‘Tech-City’ area of London. The former warehouse now contains a 75,000 sq.ft. stand-out office and retail space. The £15 million project included a three-story extension reflecting the design of the existing building. It combined its current industrial impression with a high standard modern workplace environment to cater for the thriving technology and media businesses in South Shoreditch. Working closely with Buckley Gray Yeoman architects, the team at Gilbert-Ash transformed the seven-storey building to reveal collaborative open-plan spaces with exposed concrete columns and efficient floor plates. High-ceilings and significant natural light adds to the development to create a contemporary environment. The ground floor, encompassing retail outlets and a spacious reception area, includes a curtain wall glazing exterior and black steel cladding panels for the signage zone. The façade also incorporates brick cladding and brick slip panels over new external walls. An inverted roof with decking has created terrace spaces, with tenants able to enjoy views of the Shoreditch streetscape. “The final internal and external Arnold House refurbishment works well in the surrounding modern Tech-City environment. The contemporary space has been carefully constructed to keep the industrial style of the building but with additional features you would expect in a productive, collaborative space. From the ground floor to the roof terrace and landscaped courtyard, we aimed to create a space that would meet the needs of today’s modern, flexible workforce. The building includes office space with retail units on the ground floor in a fantastic location, right in the heart of Tech City,” said Gerard Mullan, Gilbert-Ash Project Manager. Located on the corner of Great Eastern Street and Holywell Lane, the new development is a BREAMM Very Good building with a WiredScore Gold certification. The building was completed and handed over on the 10th of August.

Read More »