Armstrong Ceilings were an architect’s trusted choice for a banking icon
1011armstrong

Black metal ceilings are a key feature of HSBC UK’s new headquarters.

Armstrong Ceiling Solutions were specified for key features in a next-generation UK headquarters building because they are the architect’s trusted brand capable of supplying a complete system.

Armstrong’s B-L302 jet black custom-mesh metal planks were complemented by the manufacturer’s Bandraster grid and Axiom blind box on levels 1 and 2 of the “university” reception, marketplace (canteen) and break-out areas for HSBC UK’s new headquarters at 1 Centenary Square at Arena Central in central Birmingham.

They were selected by regular Armstrong users TP Bennett architects who, while referring to the client’s design guidelines, wanted at the same time to innovate to create a new kind of headquarters for HSBC UK to focus on retail banking and training for 2,500 people.

Located on nine acres of a key regeneration area for the city and the former home of Carlton TV, the 11-storey, 210,000ft2 building with three basement levels is constructed of steel frame with rainscreen cladding and houses offices, the HSBC university, a staff gym, restaurant and café, and an executive suite with catering.

Extensive landscaping and external public realm works help to create a new “urban meadow” and public square at what is now known as Bank Court for developers ACDL – a joint venture between Miller Developments and Pro Vinci Asset Management.

The Armstrong systems form the main feature ceiling in the university reception area and the key break-out and collaboration areas and comprise 283m2 of 1210mm x 687mm metal planks with 71% open mesh area along with 193 metres of 100mm Bandraster unslotted exposed suspension grid and 272 metres of 100mm Axiom Blind Box transitions, both also in jet black (RAL 9005).

TP Bennett associate director and interior designer Francesco Tidona said: “We specified the Armstrong systems because they are a trustworthy company who are able to provide a full system which is convenient as it includes the mesh tiles and the supporting structure as well the proprietary Blind Boxes which we integrated with linear luminaires.”

They were installed for main contractor GallifordTry over two months by a team of 10 from specialist sub-contractor Taylor Hart, a member of Armstrong’s national network of approved Omega installers.

Managing director Phil Lewis said: “The Armstrong products were excellent, incorporating a Blind Box to allow M&E to install lights into the system in place of the Bandraster grid in various areas. The system was easily built and the colour march was of a high quality for each of the components.”

More information is accessible via the Armstrong Ceilings website https://www.armstrongceilings.com/commercial/en-gb/.

LinkedIn
Twitter
Facebook
Pinterest
WhatsApp
Email
Latest Issue
Issue 324 : Jan 2025