BLE Lighting Supports Bath Project
BLE Lighting Supports Bath Project

BLE Lighting & Power Ltd helped to make history by providing Emergency Lighting Power Solutions for the brand new RNHRD and Brownsword Therapies Centre located at the Royal United Hospitals site in Bath.

Originally opened as Bath General Infirmary in 1738 as a free hospital for the poor, the historic building was closed and services gradually moved over to the new facility which, became fully operational in early September 2019.

Former patron of the Royal National Hospital for Rheumatic Diseases; HRH The Duchess of Cornwall officially opened the centre on 22 October 2019. She was given a guided tour of the £20m building and introduced to local entrepreneurs Andrew and Christina Brownsword, whose £1m Match Funding Challenge enabled the hospital charity to raise £2m towards the overall cost of the new Centre. Over the years the hospital developed a reputation as a national leader of rheumatology therapies and chronic pain services.

They now continue their service with the benefit of a purpose-built facility allowing them to utilise modern amenities including a large hydrotherapy pool, group rooms, a specialist gym, rehabilitation equipment, and a biologics treatment space.

The 3-story building utilises a wireless DALI lighting system throughout and BLE’s inverters were requested, in the initial project plan, to provide power to the emergency lighting in the event of a failure, allowing patients, visitors and staff to exit safely should they need to.

The key challenge was ensuring BLE’s inverters worked effectively with a non-BLE Lighting system.

Other lighting companies may refuse to supply emergency lighting power without also having supplied the emergency lighting fixtures. This is where BLE stands out; its emergency lighting solutions are always offered with the customers specific requirements at the core.

BLE took a front facing role working with the consultant to make sure the inverters would cooperate with the pre-identified lighting and DALI system. Although the product had been requested within the initial project, BLE’s partners were unsure of the specifics regarding what power was required and needed assistance.

Contained power was not an option because too much lighting power was required. BLE therefore recommended two of its 400W inverters and one 200W inverter which fit the purpose completely.

Additionally, the company remained on hand to provide assistance regarding the requirements for emergency lighting legislation and what the facility needed to do to in order to be compliant and ensure the safety of its occupants and the smooth opening and operation of the new facility.

LinkedIn
Twitter
Facebook
Pinterest
WhatsApp
Email
Latest Issue
Issue 324 : Jan 2025