APA Facade Systems

APA Continues Wates Partnership on Leeds Development

APA Facade Systems, Speedclad and Wates Group are continuing their partnership for the newest development in Leeds’ most sought-after business location – 4 Wellington Place. APA’s TB60 and TB60 SG facade system will be installed by Speedclad to 4 Wellington Place, marking the latest installment in this 22-acre office development. The proposed addition to Wellington Place consists

Read More »
Latest Issue
Issue 324 : Jan 2025

APA Facade Systems

APA Continues Wates Partnership on Leeds Development

APA Facade Systems, Speedclad and Wates Group are continuing their partnership for the newest development in Leeds’ most sought-after business location – 4 Wellington Place. APA’s TB60 and TB60 SG facade system will be installed by Speedclad to 4 Wellington Place, marking the latest installment in this 22-acre office development. The proposed addition to Wellington Place consists of an eight-storey triangular building, with a sloping roofline from Northern Street to Tower Square, incorporating terraces to all floors facing onto the Lifting Tower. The development frames stunning views across Wellington Place and the wider townscape, reflecting its emerging context through the use of the bronze, stone and glass as seen on 3, 5 and 6 Wellington Place. Described as ‘the jewel in the crown’ of the wider 22-acre development, on account of its unique form, 4 Wellington Place will deliver 131,500ft² nett of grade A office accommodation. It will also include 17,000ft² of ground floor retail and leisure space, in addition to basement car parking and landscape work. When entering the masterplan via the two avenues heading towards Tower Square, the proposed facades intersperse stone and bronze vertical panels with glazing, giving the reflective quality that creates the building’s jewel-like appearance. The gateway approach of 4 Wellington Place and its position sitting at the centre of the current master plan, has led to the development of a building that is distinct whilst borrowing from the architectural language of the surrounding buildings. Having already completed no’s 3 and 5 Wellington Place, APA Facade Systems is currently working on no’s 7 & 8 and is delighted to secure the latest contract in this development.

Read More »