Award-winning UK construction, refurbishment and fit out contractor, Gilbert-Ash, completed the redevelopment of Arnold House in the fast-growing ‘Tech-City’ area of London. The former warehouse now contains a 75,000 sq.ft. stand-out office and retail space. The £15 million project included a three-story extension reflecting the design of the existing building. It combined its current industrial impression with a high standard modern workplace environment to cater for the thriving technology and media businesses in South Shoreditch. Working closely with Buckley Gray Yeoman architects, the team at Gilbert-Ash transformed the seven-storey building to reveal collaborative open-plan spaces with exposed concrete columns and efficient floor plates. High-ceilings and significant natural light adds to the development to create a contemporary environment. The ground floor, encompassing retail outlets and a spacious reception area, includes a curtain wall glazing exterior and black steel cladding panels for the signage zone. The façade also incorporates brick cladding and brick slip panels over new external walls. An inverted roof with decking has created terrace spaces, with tenants able to enjoy views of the Shoreditch streetscape. “The final internal and external Arnold House refurbishment works well in the surrounding modern Tech-City environment. The contemporary space has been carefully constructed to keep the industrial style of the building but with additional features you would expect in a productive, collaborative space. From the ground floor to the roof terrace and landscaped courtyard, we aimed to create a space that would meet the needs of today’s modern, flexible workforce. The building includes office space with retail units on the ground floor in a fantastic location, right in the heart of Tech City,” said Gerard Mullan, Gilbert-Ash Project Manager. Located on the corner of Great Eastern Street and Holywell Lane, the new development is a BREAMM Very Good building with a WiredScore Gold certification. The building was completed and handed over on the 10th of August.