BDC

Search
BDC Magazine

howard ward associates

Phase one of major student accommodation completes in Coventry

Leading consulting engineer Howard Ward Associates (HWA) has assisted in the completion of phase one of The Oaks – a significant student development close to the University of Warwick.  The building, known as Oaks 1, is located less than a kilometre from the University of Warwick to the south west

Read More »

Latest Issue

BDC 319 : Aug 2024

howard ward associates

Building set to be replaced as planning permission is granted for new student flats

Planning permission for new, 10-storey student accommodation on Talbot Street, Nottingham was granted on the 24th June 2022. The scheme, which will house 318 student beds, will replace the former Domestic and General office building located on the site. East Midlands-based engineering consultancy Howard Ward Associates (HWA) has been appointed as civil and structural engineer on the development through repeat work with long established clients, McLaren Property. From its head office in Nottingham, HWA delivers construction engineering consultancy services across a range of sectors, including education, healthcare, emergency services, commercial and residential throughout the country. HWA has given pre purchase advice on engineering site constraints such as contamination, site levels and services. To support the planning application HWA provided a contamination preliminary risk assessment, transport assessment and travel plan, flood risk and SuDS strategy alongside civil and structural engineering design. The project provides an opportunity to regenerate an inner-city site in an area which is closely linked to Nottingham Trent University. Over the last five years, Wollaton Street, adjacent to Talbot Street, has been extensively redeveloped, providing areas which resemble an extension of the university campus. The purpose-built student accommodation provides social benefit by relieving pressure on community housing. Dan Bailey, managing director at HWA, said: “We are delighted to be working on the Talbot Street development following planning approval – refurbishing the former Domestic and General building into quality student accommodation for an area closely linked to Nottingham Trent University. “The site presents great opportunity to give a worthwhile contribution to the ongoing regeneration efforts in the inner city. We have been involved providing pre purchase due diligence on engineering matters and support through the planning phase for this student resi with McLaren Property, along with planning consultants Savills who navigated gaining the permission.” HWA will be working alongside Leonard Design, Chord Consult, Pulse Consult, and Evolve in the following phases, with the project programmed to complete for occupation in the 2025 academic year.

Read More »

Midlands-based engineering consultancy expands senior management team during period of growth

Civil and structural engineering consultancy, Howard Ward Associates (HWA) has restructured its management team with members stepping up to senior positions, as the company goes from strength to strength with a large pipeline of work and three new hires appointed recently. HWA sees two new buy ins to the senior management team with associates Andy Bowler who has been with the company for six years, and Dave Taylder who has been with the company just under two years, each stepping up to director level. From its head office in Nottingham, HWA delivers construction engineering consultancy services across the country across sectors including education, healthcare, emergency services and residential. The company is experiencing a period of rapid growth, appointing three new team members in recent months – including senior technician Nadeem Chaudhry, administrator and business development assistant Iqra Saleem, and senior civil engineer Theodora Francis. The expansion of the team comes in response to the growing pipeline of projects that HWA is involved in – with an approximate construction value of £100million.  Director Dan Bailey will be also taking on the role of managing director, as the company’s current managing director Giles Ward takes a step back following 26 years at HWA. Dan, who joined HWA in 2013, has more than 25 years’ experience as a civil and structural engineer, working in the public and private sectors on varied projects both regionally and nationally. The firm has recently worked on impressive projects such as the Alfreton Park Community Special School in Derbyshire and the Nottinghamshire Police and Nottinghamshire Fire and Rescue Service joint headquarters as well as substantial high quality student accommodation schemes in Brighton and Coventry. On the restructure, managing director, Giles Ward said: “During my 26 years with the company I have been delighted to see our client base, portfolio and the range of services we offer continue to grow. We have been involved with a huge array of schemes across the country from pre-acquisition through to project completion – from heritage to healthcare, and the future of the company is positive as we expand our team to manage our strong pipeline of work. “Congratulations to Andy, Dave and Dan on their new positions – It is an exciting period for the team, as we focus on nurturing the relationships that we have with our clients and celebrate the fantastic work that has been achieved to date.” Dan Bailey commented: “I am extremely pleased to be taking on this new role at an exciting time for the company, and to be able to reward Andy Bowler and Dave Taylder for the key parts they have played in the success of the business over recent years. Congratulations to them on stepping up to director level. “I believe that an expanded senior management team gives a solid base for growth and we look forward to further diversifying HWA’s client base and the sectors in which we work.”

Read More »

Major solar PV project set to cut carbon in Coventry appoints partner engineer

Midlands based construction engineering consultancy, Howard Ward Associates (HWA), has been appointed by Ineco Energy to deliver a major solar PV project at 41 sites across Coventry. The scheme is part of a wider decarbonisation strategy in the city which will deliver carbon reductions and renewable energy generation improvements across a number of council-owned sites; such as sports facilities, schools, office buildings, cemeteries and country park visitor centres. Civil and structural engineer HWA has specialist expertise in the solar PV sector and has advised on major schemes across the UK. For Ineco, the practice has been appointed to provide surveys and assessments, to determine the structural capacity for the installation of solar panels and inverters. The ambitious programme will generate 1,840 MWh of energy, with the potential to save Coventry City Council up to £276,000 annually. Over the lifetime of the projects, it will save the carbon equivalent of planting 9,766 trees. The first phase of works – which was funded by the Public Sector Decarbonisation Scheme (PSDS) – saw the completion of six Coventry schools, ahead of the new 21/22 academic year. Giles Ward, director at HWA, said: “We are really pleased to be working on a number of solar PV installations across Coventry alongside Ineco Energy. The scheme is contributing to the city’s decarbonisation strategy, helping to deliver carbon reductions and renewable energy systems on a significant scale.” “This is a diverse industry in which we have gained extensive knowledge and experience in since the field was in its infancy. It is great to see that solar PV installations have developed significantly, and their demand and accessibility continue to grow as local authorities, businesses and organisations across the UK seek energy-efficient solutions.” Works have also begun on the Coventry Central Library, a Council office building and Windmill Road Cemetery in the city, due to be completed this month. Angus Rose, director of Ineco Energy said: “We’re extremely proud to be helping Coventry City Council to reduce its carbon footprint with the installation of solar PV across the region. There has never been a more important time to reduce the carbon footprint of our communities and secure a greener future for generations to come. “This part of the project, funded by PSDS, only scratches the surface of the ambitious project with Coventry City Council. The ongoing decarbonisation plans funded by ERDF will allow the Council to make buildings more energy efficient and help the region reach its net zero target.” Phase 2 will see solar PV being installed across 32 further Coventry City Council public buildings and is funded through the European Regional Development Fund (ERDF). Ineco Energy specialises in the development, installation, and ongoing management of renewable and energy-efficient solutions for local authorities, schools and businesses within England and Wales.

Read More »

Phase one of major student accommodation completes in Coventry

Leading consulting engineer Howard Ward Associates (HWA) has assisted in the completion of phase one of The Oaks – a significant student development close to the University of Warwick.  The building, known as Oaks 1, is located less than a kilometre from the University of Warwick to the south west of Coventry city centre, and was developed by McLaren Property, together with project managers Stace and Corstorphine + Wright Architects . The project was forward funded by Student Roost who now operate the Accommodation. Formerly the site of an office building, Oaks 1 brings 378 new student rooms to the area in a mixture of 288 cluster bedrooms and 90 studios, which are within convenient walking distance of the university’s main campus. The scheme also benefits from over 6,800 sq. ft. of amenity space; comprising an open plan common room and games room, gym and virtual training areas, study areas and social spaces, and has provided significant contributions towards the sustainable transport infrastructure in the area. HWA supplied civil and structural engineering services from feasibility and planning stages to phase one of the project. Phases two and three which include two further buildings – Oaks 2 and Oaks 3 – is currently under construction, and would deliver a total of 1,000 student rooms and studios. The Oaks is the only purpose-built student accommodation scheme adjacent to the University of Warwick. Demolition works for phase one began in September 2018, with McLaren Construction starting the main build contract the following month. Completion was ahead of the expected completion date – ready for the 2020/21 academic year. Dan Bailey, director at HWA, said: “We are pleased to be continuing our long-standing working relationship with McLaren Property and the rest of the supply team on this significant project in Coventry. “As the only purpose-built, large-scale student accommodation in the area, this will provide much-needed, quality rooms and studios for students to enjoy as they attend the University of Warwick. The accommodation couldn’t be in a better location, bordering the main campus with everything students need within easy reach. “We’re proud to be continuing our work in the Midlands, particularly in these challenging times, and look forward to seeing the next phase of the project progress.” From its head office in Nottingham, HWA delivers construction engineering consultancy services across a range of sectors, including education, healthcare, emergency services, commercial and residential across the country.

Read More »