BDC

Search

Wates starts phase two of Derby Market Hall

Wates starts phase two of Derby Market Hall

Wates Group has started refurbishment work on the second phase of the Derby Market Hall. The Victorian Market Hall on Tennant Street is set to become a vibrant retail and leisure destination, linking the Derbion shopping centre and St Peter’s Quarter to the Cathedral Quarter and the Becketwell regeneration scheme. When complete, the refurbished Market Hall will pay homage to its heritage while evolving to meet modern needs and consumer demand.

A vital part of this next phase is to develop the public space at Osnabruck Square, a key entrance to the Grade II listed building, as well as reinstating the north entrance.

The refurbishment is being led by Wates Group, which is working in collaboration with Derby City Council. The project team is made up of specialists operating within the region, including Lathams Architects, structural engineers Rodgers Leask, and M&E consultants Clancy.

The Guildhall Yard will also be enhanced to resurface the existing tarmac and the entire courtyard will be re-paved following the demolition of the existing 1980s stair and lift tower.

Internal works will focus on the new flexible market hall space featuring free-standing mobile stalls to create an accessible space for events and activities such as food and music festivals. To accommodate a high-quality food and drink offer, the balcony will have a bottle bar and an emphasis will be placed on street food but with the flexibility to adapt to future trends.

Further work in this phase includes refurbishments made to the first-floor shops, new durable flooring, improved back-of-house storage, improvements to fire safety, and new WC facilities. A new, grand central staircase is also proposed to the north of the Market Hall, replacing an existing stairwell and removing any potential for anti-social behaviour.

The grand staircase will reflect the position and form of the original 1864 stair, connecting to the balcony in a contemporary, light and inviting route. It will feature a glass balustrade designed to contrast with, yet complement, the historic metal balustrade across the balcony.

Wates was appointed via SCAPE’s Major Works framework. The second phase of development is set to complete at the end of 2024.

Building, Design & Construction Magazine | The Choice of Industry Professionals

LinkedIn
Twitter
Facebook
Pinterest
WhatsApp
Email

Latest Issue

BDC 316 : May 2024