Kenneth Booth

HW Martin Waste Supports Courage Awards 2021

This year the Rotary Club of Mansfield celebrated 30 years of the Courage Awards – the annual event celebrating the courage and achievements of young people in the area.  HW Martin Waste Ltd was proud to be involved once again, as one of the main sponsors of this special event

Read More »

MC Construction wins place on new Daresbury Laboratory framework

MC Construction has won a place on a new three-year framework for improvement works at the internationally-renowned Daresbury Laboratory in Cheshire. Salford-based MC Construction has been appointed by the Science & Technology Facilities Council (STFC). Part of the Science & Technology Facilities Council, STFC’s Daresbury Laboratory has more than 300

Read More »

Homes on a grand scale set to radiate from HS2 station

New sites for 25,000 homes around west London’s Old Oak Common HS2 station are being proposed following the collapse of negotiations over the Cargiant site. The Mayor’s Old Oak and Park Royal Development Corporation, OPDC, has submitted a revised draft local plan after a planning inspector told them in 2019

Read More »

Modular Technology and The Golden Thread

In her report ‘Building a Safer Future’, Dame Judith Hackitt highlights the need for a system-based approach with a golden thread of information running through the lifecycle of each project. Here Jackie Maginnis argues the case for modular technology in providing a comprehensive information pathway. As made clear in the

Read More »

Celebrating STEM career diversity in construction

British Science Week, which in 2021 takes place from March 8 to 13, celebrates the broad range of jobs and careers available in science, technology, engineering and maths (STEM) industries and promotes STEM to younger generations by providing activity packs and school projects. While children learn the core sciences, like biology,

Read More »
Latest Issue
Issue 345 : Oct 2026

Kenneth Booth

February contract awards rise by 11% to £4.7bn but remain below average levels

In February 2021, contract awards increased by 11% compared to January to £4.7 billion, this remains below average levels, but underlying activity has increased as no single project was valued over £200 million. Similarly to January, distribution centres make up two of the top four contract awards. The latest edition of the Economic & Construction Market Review from industry analysts Barbour ABI, highlights levels of construction contract values awarded across Great Britain. Sector analysis shows that residential strengthened in February to £1.9 billion with strong activity in the West Midlands. Infrastructure also picked up, rising £78% to £900 million following a disappointing January. The largest infrastructure projects are the National Grid LNG terminal expansion in Kent and the M25 Junction 28 improvements in Essex. The industrial sector, led by warehousing, continued as the hottest sector, with two of the top four projects being distribution centres: a distribution hub in Wakefield worth £186 million and a Lidl distribution centre in Bedfordshire with a value of £100 million. Commenting on the figures, Tom Hall, Chief Economist at  Barbour ABI and AMA Research said, “There was not a huge amount to see in February as planning activity was maintained; no pre-budget optimism to be seen. Contract awards strengthened slightly while planning applications and approvals weakened. Approvals particularly are looking fragile. Elsewhere the significant activity in warehousing and distribution continued, and infrastructure contract awards returned to previous levels after a weak January.” Download the full report here:  https://www.barbour-abi.com/zones/2103032-Snap-Analysis-March-Output-File- v2.pdf

Read More »

New housing developments in Scotland should contain mobility hubs – transport charity

Large housing developments should contain ‘mobility hubs’ for transport as a condition of planning consent to improve the environment and reduce congestion, ministers have been told. Responding to a Scottish Government consultation, shared transport charity Collaborative Mobility UK (CoMoUK) said greener travel should be at the heart of the country’s planning future. It urged ministers to consider requiring developers of housing estates containing 50 dwellings or more to create hubs containing facilities such as electric vehicle charging, bike sharing and car club schemes. In smaller developments of 25 homes or more, housebuilders should be required to install at least one shared transport initiative, the charity argued. The Scottish Government’s Fourth National Planning Framework (NPF4) recently closed for submissions and asked for views on how the country’s planning structure could help the environment, boost the economy and improve public health. The climate emergency declared by the Scottish Government and most local authorities aims to achieve a ‘net zero’ status by 2045. CoMoUK pointed out in its submission that transport is now Scotland’s largest emitting sector, contributing 36 per cent of greenhouse gasses, and that the largest source within that was private cars. It has urged ministers to do more in terms of promoting shared car schemes and encouraging cycling and shared transport. The Covid-19 pandemic should be used as an opportunity to pursue alternatives, the response said, especially with behaviour changes persuading more people to return to their car. The organisation added that better shared transport would help more deprived communities in terms of connectivity, and increased walking and cycling would improve physical and mental health. CoMoUK is pioneering the development of European-style mobility hubs in the UK. These bring together public transport stops for buses, trams and trains with bike share schemes, car clubs, e-scooters, electric vehicle charging points, bike racks and shared taxi rides, as well as community facilities such as cafés, fitness areas, green space, package collection points and wifi and phone charging – all with covered waiting areas, real-time journey planning information, walking areas and disabled access. Lorna Finlayson, Scotland director of CoMoUK, said: “Scotland cannot achieve the reduction in greenhouse gasses it needs without changing the way people move about. “Reform to the planning system over the coming years provides an opportunity to do exactly that. “All over the country new housing estates are being built – that provides the perfect chance to install more mobility hubs. “People who have just moved are more open to changing their transport habits and trying out new opportunities. “This is an action the government could take now which would have a positive impact on the environment, the economy and public health. “Getting this right will help everyone and assist the government in many of the targets it has set itself across a range of issues.” The CoMoUK submission states: “By embedding shared transport and mobility hub policy into NPF4, shared mobility can grow further, developing a national network of hubs, serving a wider population and diverse locations and communities. It can contribute to the decarbonisation of the transport sector as well as the rebalancing of the planning system to prioritise climate and the four main outcomes by 2050.”

Read More »

SES Engineering Services wins £25m contract to create flagship ‘smart building’ in central London

National engineering specialist, SES Engineering Services (SES), has been appointed to deliver £25m worth of MEP services to Helical’s latest commercial offering in the capital, known as 33 Charterhouse Street.  Working alongside lead contractor, Mace, SES will provide full mechanical, electrical and plumbing (MEP) services at the 200,000 sq ft 10-storey block in the heart of Farringdon. It will involve a Category A office fit-out, with integrated building services to make the building ‘smart’ and ultimately, more energy efficient – making variables like heating, lighting and security accessible on one network and giving the end user sight and control over the entire building using just one platform.  The build, part-funded by Ashby Capital, has been carefully designed to be Helical’s first commercial offering that targets a BREEAM rating of Outstanding, and will play a significant role in supporting the developer to meet its ambition of having all new developments net zero carbon and in operation by 2025.   SES is working closely with all delivery partners and stakeholders – including the end facilities management company, Ashdown Philipps – to ensure all services can be integrated correctly and are designed for frictionless operation. Offsite technology is playing a large part in delivery, with components built and tested at its offsite manufacturing centre, Prism, while an extensive digital twin model has also been created to ensure seamless assimilation.  The firm’s appointment follows its successful completion of Helical’s Barts Square over two phases in nearby Bartholomew Close, while SES is also working alongside Mace at the landmark Battersea Power Station regeneration.  SES will commence on site in 2021 and will complete next year.    Steve Joyce, SES’ managing director, said:   “Regardless of the challenges thrown at the commercial sector this year, the future of office developments is moving towards a more digital, integrated and sustainable approach and 33 Charterhouse Street will be a fantastic example of this shift.   “We’ve worked with Helical before and their forward-thinking approach matches our own. The client has tasked us, as well as the rest of its delivery partners, with supporting an ambitious, but necessary goal in regard to becoming carbon neutral, and we’re proud to support them in achieving it.  “Integrating so many building systems is an incredibly complex task and early collaboration between ourselves and all stakeholders is vital, as well as the ability to manufacture a large amount offsite. This will save an estimated 14,669 labour hours on site – helping improve efficiency at its central London location, and support arrangements to reduce personnel on site wherever possible in the wake of the Covid-19 pandemic.” 

Read More »

HW Martin Waste Supports Courage Awards 2021

This year the Rotary Club of Mansfield celebrated 30 years of the Courage Awards – the annual event celebrating the courage and achievements of young people in the area.  HW Martin Waste Ltd was proud to be involved once again, as one of the main sponsors of this special event held on the evening of Tuesday 2nd March. Due to the social distancing restrictions currently in place, the event was held virtually via Zoom, which posed a new challenge for Rotary Club President Kate Allsop and the event organisers.  However, it was a great success with over 100 people viewing the proceedings. The 11 young people recognised at the Awards were: Leoni Bragg and Abigail Cross, of Meden School, Warsop; Owen Brown and Rachel Tweedie, of Portland College;  Adam Hooley, of Reach Learning Disability; Corey Root, of A Place To Call Our Own; Annabelle Pye, of West Nottinghamshire College;  James Slaney, of R.E.A.L. Education; Daisy Marie–Stanley, of The Beech Academy, Mansfield; Connor Summerell, of Samworth Church Academy, Mansfield; and Joshua Stead, of The Joseph Whitaker School, Rainworth. Each received a plaque from the Rotary Club and a civic citation from the Mayor of Mansfield, Andy Abrahams. Many comments of appreciation were received from parents and attendees.  Louise and Richard Stead, parents of 12 year-old Josh, commented, “I would like to extend my thanks to the Rotary Club of Mansfield for recognising the bravery or our son Josh at this afternoon’s Bravery Awards. 2020 has without question been tough on the whole community, but the added difficulties a shock diagnosis has brought to Josh and our wider family makes the recognition even more special. The positive news is that he is essentially brain tumour free and should be able to continue a normal life. He has already resumed rugby training and hopefully will be playing as soon as lockdown permits. Thank you once again.” Details on each of the young people recognised at the Awards can be seen HERE. Mansfield Rotary Club is one of over 34,000 clubs in 200 countries, which form Rotary International.  The Mansfield Rotary Club’s Courage Awards is an example of the community work it undertakes throughout the year to benefit youth groups, families in need, the infirm and service men and women. HW Martin Waste Ltd, based on the border of Derbyshire and Nottinghamshire, has pledged to support local initiatives through the provision of funding and resources.

Read More »

Lismore advise Lothian Pension Fund on the £14.326m acquisition of Titan

Lismore Real Estate Advisors (Lismore) has advised Lothian Pension Fund on the acquisition of a prime logistics warehouse at Eurocentral in North Lanarkshire from Windward Titan Limited. “Titan” is a prime distribution facility and, at 123,850 sq.ft is one of the largest modern industrial buildings in Scotland. The sale price of £14,326,000 reflects a net initial yield of 5.01% and capital value of £116 per sq ft. The asset occupies a prominent position within Centralpoint at Eurocentral, Scotland’s premier logistics park. Located within the heart of Scotland’s central belt, Eurocentral provides unrivalled connectivity via the national motorway network and the rail freight terminal. It is home to occupiers such as LIDL, Amazon, Morrison’s, Fedex and Eddie Stobart. Titan is currently let to The Scottish Ministers (NHS) until 31st January 2031, at a rent of £766,094 per annum reflecting £6.19 per sq.ft. Simon Cusiter, director of Lismore, said: “We were delighted to act on behalf of Lothian Pension Fund in relation to the acquisition of Titan. Eurocentral continues to go from strength to strength, resulting in upwards pressure on rents. The strong fundamentals of the location and sector, coupled with the quality of the asset offer scope for strong performance in the short to medium term.” The industrial and distribution market in Scotland remains remarkably robust, reflecting occupiers demand for larger “big box” properties, such as Titan. The development pipeline is limited across the central belt of Scotland and further rental growth is anticipated, as supply remains tight. Nicola Barrett, portfolio manager for LPF added: “It was a pleasure to work with Simon and the Lismore team on this acquisition. We are pleased to have secured the asset for our portfolio and the strong property fundamentals reflect our strategy going forward.” Lismore Real Estate Advisors advised Lothian Pension Fund whilst MWM Consultants acted on behalf of Windward Titan Limited.

Read More »

MC Construction wins place on new Daresbury Laboratory framework

MC Construction has won a place on a new three-year framework for improvement works at the internationally-renowned Daresbury Laboratory in Cheshire. Salford-based MC Construction has been appointed by the Science & Technology Facilities Council (STFC). Part of the Science & Technology Facilities Council, STFC’s Daresbury Laboratory has more than 300 staff and is located at Sci-Tech Daresbury, which spans nearly 200,000 sq metres. MC Construction achieved the highest overall score in the tendering process for refurbishment, replacement and maintenance projects worth up to £500,000 in value. Its first-place ranking means it will be awarded all works up to £15,000 in value under the terms of the framework. The estimated total spend under the agreement will be up to £2m a year. Projects will range from minor construction works to extensions and lab and office fit-outs. Russ Forshaw, group operations director at MC Construction, said: “STFC’s Daresbury Laboratory is internationally recognised for its world-leading scientific research. “We are thrilled by our appointment to improve and maintain this inspiring campus via the new framework, and coming first in the tender process highlights that our experience, processes and personnel are of the highest standard to deliver a wide range of projects. “The framework will enable us to showcase the flexibility we offer via our core construction business and facilities services division. In addition, our specialist local supply chain, who will be helping to deliver small and large projects, will have an important role to play in the delivery of future schemes. “We look forward to starting projects in the near future and to building a strong relationship with the client.” MC Construction undertakes building projects throughout the north west with a focus on the commercial, education, heritage, hospitality, industrial, local authority, social housing and healthcare sectors. Its other framework partnerships include Manchester Airport, Royal Mail Group, Transport for Greater Manchester, the University of Manchester, Salford City Council, Cheshire East Council, STAR Procurement, the Crown Commercial Service, North West Construction Hub and the Rise Construction Framework. The family-owned business is based on Oldfield Road, Salford, and employs 60 people. It is celebrating its golden jubilee in 2021. Phill Smith, mechanical project manager at STFC’s Daresbury Laboratory, said: “With plans to update and refurbish lab and office space across Daresbury Laboratory, we have a very busy schedule planned for the next few years. “I’m looking forward to working closely with MC Construction at this exciting time.”

Read More »

Homes on a grand scale set to radiate from HS2 station

New sites for 25,000 homes around west London’s Old Oak Common HS2 station are being proposed following the collapse of negotiations over the Cargiant site. The Mayor’s Old Oak and Park Royal Development Corporation, OPDC, has submitted a revised draft local plan after a planning inspector told them in 2019 their housing estimates were too large. London’s mayor Sadiq Khan said: “I look forward to seeing this plan adopted and a healthy and inclusive new district emerge in this important part of west London.” He said the corporation’s plan complemented the recently published London plan. The OPDC has moved its focus to around the station, where a lot of the land is public sector owned, to accelerate creating a new urban centre. The corporation points out the site is unique for being the only spot in London where HS2, the Elizabeth Line and Great Western Rail services meet. String of lively neighbourhoods in the pipeline OPDC chief executive David Lunts said: “Our aim though, is not just new homes and jobs; we are creating a desirable, exceptionally well connected and bustling series of districts for London where live, work, play is more than just a slogan.”  He said the corporation would be consulting the local community while preparing a bid for government infrastructure funding. Mr Lunts said he expected the new local plan to be adopted by the end of the year pointing out that 6,000 homes were already being constructed. “Our aim though, is not just new homes and jobs; we are creating a desirable, exceptionally well connected and bustling series of districts for London where live, work, play is more than just a slogan,” said Mr Lunts. Hank Zarihs Associates said development finance lenders were looking to back projects in spots with excellent transport links such as those at Old Oak.  Existing businesses in Old Oak North will be protected by designating key sites for long-term employment. It is expected to deliver a quarter of a million square metres of additional industrial space over the next 20 years, encouraging new businesses and helping existing ones to grow. OPDC has been working with local landowners to prepare the plans and will continue to work closely with Ealing, Hammersmith & Fulham and Brent councils, High Speed Two, the Department for Transport, Network Rail and the local community.

Read More »

Modular Technology and The Golden Thread

In her report ‘Building a Safer Future’, Dame Judith Hackitt highlights the need for a system-based approach with a golden thread of information running through the lifecycle of each project. Here Jackie Maginnis argues the case for modular technology in providing a comprehensive information pathway. As made clear in the Hackitt report, providing a golden thread of information from concept to completion is a process that many in the construction industry are struggling to implement. Central to the concept is guaranteeing the traceability and availability of project data and all decisions relating to the design, construction, safety performance and maintenance of the building. The ‘thread’ involves the information handed over at the completion of a project which must be right from the start of client ownership and then must remain accurate throughout the building’s lifecycle. With traditional construction often key information such as product specification and maintenance details are not complete or accurate at the point of client handover which means the golden thread required for optimal running and safety cannot be achieved. Currently fire safety is divided into pre-construction regulation, covering the approval of building design, and post-construction regulation for the period of the building’s occupation and use. This two-stage approach can lead to a disconnect at handover and complicates decision making, causing a lack of information which hampers for example, the carrying out of risk assessments. Traceability and Accountability With modular construction all data can be validated and coordinated as part of a structured process, which helps provide accurate and reliable information for clients at the point of handover. It also means it is easier to identify what products and material specifications were used on previous projects should any legislation changes occur. By verifying the materials and products to be used on a construction scheme and by simplifying the onsite assembly process, volumetric modular construction offers developers an opportunity to avoid many traceability issues. Modular construction helps ensure client satisfaction and product assurances through the certainty and quality embedded into the build process. Modular builds are less susceptible to poorly specified manufacturers’ products as time can be taken upfront to validate the correct specification of materials. This allows clients to have confidence in the quality and performance that they can expect from their new building. By completing large elements of construction away from the build location, they can also reduce th­­­e length of construction time spent onsite as well as reduce the risk of unforeseen construction issues. It is standard practice for Building Information Modelling (BIM) to be embedded into the design and advanced manufacturing processes involved in modular construction. As an established method of sharing building lifecycle data across design, construction and operation – BIM is also regarded as integral to achieving a golden thread. Since 2016 the BIM mandate has required UK public sector construction projects to use BIM technology. This has helped speed up the pace of adoption during the design and construction phases. It has been predicted that government intervention around the golden thread will accelerate things further. As I have mentioned before, modular construction is not a new industry but through learnings from advanced manufacturing and best practice in other sectors, it represents a genuine opportunity to disrupt an often-disjointed industry which suffers from a lack of data traceability and accountability. With its powerful combination of controlled deliverables and customisable outputs, modular construction provides the repeatable quality and safety needed to meet client demands. It is going to be difficult to achieve the levels of assurance and traceability the UK construction industry will need to actively deliver a golden thread of information from concept to completion – without an even wider adoption of modular technology. About MPBA The MPBA plays a key role in the connecting of sectors in the modular and portable building industry. The association collaborates with specialist technical advisors to enhance innovation in the design and manufacture of modular buildings. These can be designed and manufactured from timber or steel in any size and shape to meet individual client needs while ensuring full compliance with Building Regulations. To discover how modular technology can benefit construction projects go to: www.mpba.biz

Read More »

Celebrating STEM career diversity in construction

British Science Week, which in 2021 takes place from March 8 to 13, celebrates the broad range of jobs and careers available in science, technology, engineering and maths (STEM) industries and promotes STEM to younger generations by providing activity packs and school projects. While children learn the core sciences, like biology, chemistry and physics as part of the curriculum, many are yet to understand how to apply the knowledge to real life situations. To support British Science Week, Harjinder Randhawa, Laboratory Supervisor at Finning UK & Ireland, discusses his lesser known, but important, role in fluid analysis. While the typical picture of the construction industry is of operators in hard-hats at work on the job site, a lot of science and engineering goes on behind the scenes. Similarly, the traditional picture of a laboratory — white lab coats, goggles and test tubes — is not always the reality, a large amount of research and data analysis will take place outside of the lab environment. My role ties together the two — monitoring the condition of construction equipment using laboratory techniques. The aim is to reduce wear and tear on equipment and avoid unexpected repair costs. Condition monitoring facilities, like Finning’s fluid analysis lab in Leeds, test oil and other fluids from vehicles ranging from excavators and buses, to lifeboats and racing cars. These laboratories carry out techniques including particle count, particle quantification, gas chromatography (GC) and analysis of trace metals, to monitor the condition of the fluid and the equipment it was taken from and report back to the customer, while suggesting proactive steps to take to optimise the life of both. Though condition monitoring labs usually only test the oil and report the data to customers, employing lab technicians and diagnosticians who have science and engineering backgrounds can give a more comprehensive picture to the customer. Diagnosticians can point out specific issues with the equipment, such as a faulty bearing, and explain the different levels of severity to the customer, rather than making them decipher the data themselves. Equipped with a strong understanding of fluid and equipment condition, construction businesses can plan in proactive maintenance to prevent costly breakdowns. Consider this example. An excavator in a quarry has not had its oil regularly checked and a buildup of residue has caused the engine to fail 70 metres underground. The breakdown causes unexpected downtime and reduces the productivity of the workforce, as additional workers and equipment are needed to help pull it to the surface and take it off site to be fixed. Regular oil sampling will help identify any faults that need addressing and allow the site manager to fix them proactively, saving time and money. Lab technicians and diagnosticians who carry out fluid analysis have a varied and vital role in keeping the construction industry running. British Science Week is a great event for busting the stereotypes of STEM careers, sharing the behind the scenes of different industries and encouraging young people to consider STEM in the future. Chemistry skills learnt in school can easily be transferred into a lab technician role, and I hope future generations will consider it as a possible career choice. If you or someone close to you might enjoy a career in fluid analysis, apply for our newly launched Laboratory Technician Degree Apprenticeship programme here.

Read More »

GF Piping Systems donates 5’000 ELGEF Plus Fittings to quake-stricken Croatia

On 29 December 2020 central Croatia was hit by strongest earthquake in 140 years and the three waterworks of the cities Sisak, Petrinja and Glina were heavily damaged. With the help of their Croatian partners PTMG, GF Piping Systems organized the donation of 5’000 pieces of ELGEF Plus Fittings in various sizes to help repair and replace the damaged water pipes as fast as possible and to ensure sustainable water transport. The earthquake with a magnitude of 6.4 Mw hit central Croatia was the strongest recorded in 140 years, with the epicenter located 3 km west-southwest of the city of Petrinja. The adversely affected areas were mostly in the Sisak-Moslavina County, but the strength of the earthquake was felt in all surrounding countries, even in Austria and Germany. The cities Sisak, Petrinja and Glina along with their surrounding villages were badly damaged, while the center of Petrinja was totally destroyed. The earthquake caused shifts of soil with an amplitude of up to 70 centimeters. The water distribution for the affected areas is provided by three waterworks: for the city of Sisak – Sisacki Vodovod, for the city of Petrinja – Privreda Petrinja and for the city of Glina – Vodovod Glina. Together, they manage almost 600 km of water pipelines.​After the earthquake, Sisacki Vodovod managed to deliver water to all habitants, despite numerous water leakages that resulted in a total water loss of almost 3’000 cubic liters per day. But even 30 days after the earthquake, Privreda Petrinja was still not able to produce water because their water stations were destroyed and they are dependent on Sisacki Waterworks. Vodovod Glina’s warehouse collapsed and they had to ask for instant help from the surrounding waterworks. All three waterworks are trying to locate damaged existing pipes. Their next step will be to replace damaged pipes with more suitable material for earthquakes, such as PE material.​The donation of almost 5’000 pieces of ELGEF Plus Fittings in various sizes from GF Piping Systems will be a tremendous help to start repairing and replacing the damaged water pipes. It helps the waterworks to act fast and eliminate the water loss that was caused by the earthquake. ELGEF Plus is the correct choice for all water, gas and multiple industrial pressure applications. Corrosion-free, low weight, high chemical resistance, low overall costs and an extensive service life of installations are just a few of the many advantages of the ELGEF Plus system. The extensive customization of ELGEF Plus products, coupled with the system’s flexibility, offers decisive advantages.Using PE material will be a resilient and sustainable flow solution for the future.  For more technical product details on ELGEF Plus Fittings, visit: https://www.gfps.com/com/en/products-solutions/systems/elgef-plus.html

Read More »