Kenneth Booth

Caddick drives home a £6.5 million luxury car showroom in Carlisle

Caddick Construction completes work this month on the £6.5 million flagship Mercedes-Benz showroom and workshop at Kingmoor Park in Carlisle. Completed on behalf of dealer Sytner, the state-of-the-art facility will create over 20 new jobs in the area. Heavily glazed for maximum impact, the showroom provides a stage for the

Read More »

How using an interior designer can make the most of your space

Beautiful spaces are carefully designed and decorated by experts to make the people who use those spaces feel relaxed, comfortable and surrounded by beauty. When you walk into an amazing hotel, or shop and are inspired by the decoration and the use of light and space that gives it personality,

Read More »
Entry now open for the PPMA group industry awards 2019

Entry now open for the PPMA group industry awards 2019

The 2019 PPMA Group Industry Awards will be held at the National Conference Centre (NEC), Birmingham, on the evening of the first day of the PPMA Total Show 2019 – Tuesday, 1 October 2019. Award entry submissions are FREE and now open to all PPMA Group members (PPMA, BARA and

Read More »

Fall protection cost-cutting: a step too far?

Any work at height carries risk. Preventing accidents from falls relies on all stakeholders using an informed, joined-up approach to practices and systems. Specifiers, contractors, system installers and end-users all play a part in risk mitigation. James Sainsbury, Fall Protection Sales leader for MSA Safety, explains why a holistic approach

Read More »

Tips to ensure safe industrial dust collector operation

Industrial plant personnel will need the help of industrial dust collectors to ensure that employees and the working environment is safe for general working conditions and to meet policies set by the regulating bodies. These devices can be quite pricey thus it makes it a prime concern for most businesses

Read More »

5 Guidelines to Write the Best Dissertation

Doctoral students need substantial research which is a piece of document in order to get doctoral students. When it comes to writing the dissertation, many students fail to complete it because of not being able to give enough time. However, it is not difficult to write a dissertation if the

Read More »

When Will LEED V4.1 Be Featured In LEED Credentialing Exams?

The world’s most widely used green building rating system, LEED, is getting updated to improve building performance and to integrate the latest reference standards. The current LEED rating system, which is LEED v4, was launched at the Greenbuild International Conference and Expo in Philadelphia on November 20, 2013. Over the

Read More »

WORK TO COMMENCE ON BELFAST’S MOST EXCLUSIVE NEW BUSINESS ADDRESS

TODD Architects is pleased to report that construction work is about to commence on The Mercantile office development in Belfast following approval by Belfast City Council. This landmark office building is located on a prime commercial site within the main public square and civic space in Belfast City Centre directly

Read More »

Major Edinburgh Development Approved by Local Council

IMPORTANT plans for the future supply of homes in Edinburgh have been given the go-ahead by Councillors at a hearing on the 22 MAY 2019. The 655-home development at Cammo Estate is a consortium project by CALA Homes and David Wilson Homes and includes 164 much-needed affordable homes. The development

Read More »
Latest Issue
Issue 344 : Sep 2026

Kenneth Booth

Caddick drives home a £6.5 million luxury car showroom in Carlisle

Caddick Construction completes work this month on the £6.5 million flagship Mercedes-Benz showroom and workshop at Kingmoor Park in Carlisle. Completed on behalf of dealer Sytner, the state-of-the-art facility will create over 20 new jobs in the area. Heavily glazed for maximum impact, the showroom provides a stage for the high quality vehicles and includes customer amenities such as a coffee lounge and merchandise shop, as well as a drive-through facility, cosmetic repair, MOT studio and wet/dry valet with extensive car parking. Replacing a previous facility in Rosehill Industrial Estate, the new prominent location within the city’s enterprise zone offers an opportunity for the Sytner team to provide its clients with a higher level of service and attention. John Buchan, Group Project Manager at Sytner Group, said: “We are delighted with our new state-of-the art facility in Carlisle that represents the first of the Mercedes Benz new Corporate Identity in the UK” Barry Crooks, Head of Business at Mercedes-Benz of Carlisle, said: The new site is a world apart from our previous home which we had completely outgrown and is bigger and better in absolutely every respect.  Caddick have helped us build a real show-stopping environment which is now much more befitting of the brand we represent.  It includes an 18-bay workshop which will be better able to meet the demands of our customers when it comes to servicing and MOTs. Outside our approved used car display will rise from 40 to 90 cars to offer more choice than ever before and on-site parking has increased enormously which I know will delight our customers.” Derek Billows, Contracts Manager at Caddick Construction, said: “The showroom looks fantastic in such a notable location. We have worked closely with Sytner to ensure the highest quality environment, using our wealth of expertise in delivering automotive developments across the north of England.” Caddick has recently delivered showrooms for The Car People, in Warrington, Jaguar Land Rover in Kendal and Vertu Motors’ Farnell Jaguar Land Rover in Leeds. The automotive team is currently on site constructing the £41million Jaguar Landrover, Mini and BMW showrooms at the Trafford City Development, as well as JCT Porche in Newcastle. Images are attached of the new showroom About Caddick Construction Caddick Construction and Caddick Civil Engineering are the operational arms of Caddick Group PLC, offering more than 35 years’ experience across a range of market sectors including commercial, education, industrial, leisure, refurbishment, residential, care, retail, mixed-use and fit out. The Group employs almost 500 people and its turnover exceeds £150 million. Caddick Construction was recently named the Best Main Contractor to Work With (£50m-£250m turnover) by Construction Enquirer, and was recognised as a considerate constructor and the Considerate Constructors Scheme’s National Site Awards. For further information on Caddick Construction, visit www.caddickconstruction.co.uk

Read More »

Construction continues its move towards greater digitisation

NBS, who have been monitoring BIM adoption in the UK for almost a decade have announced their 2019 BIM survey results which show that overall trends of BIM awareness and adoption have grown from little more than 10% in 2011 to around 70% in 2019. Although the latest report, which received more than 1,000 responses, does show a 1% decline in adoption, NBS remains confident that BIM will continue to embed itself in workflows as construction continues to move in a positive direction, embracing collaborative and digital ways of working. Commenting on this Dr Stephen Hamil, Innovation Director for NBS said, “In the early days of BIM, some may have equated it to simply generating drawings from a model. “There is now a wider understanding that BIM is about project teams following a common process based on standardised information and collaboration. We think we’re seeing a period of consolidation – where more people understand what BIM really represents and are embedding that into their workflows.” The survey shows that there has been a trend of increasing BIM awareness and adoption across the UK industry, using standards and protocols as the platform for this. This national success will be bolstered with the new ISO 19650 series, creating a standardised digital process across the world based, in part, on the BS 1192 standards. This BIM Report 2019 lists some of the main barriers to the adoption of BIM, such as lack of client demand, the need for training, the time required to get up to speed and a lack of standardised tools. NBS says it has sought to align the NBS content and software to the ISO method of working to allow its customers to more easily produce BIM deliverables within their project teams for clients. NBS Chief Executive Richard Waterhouse commented, “We have seen some negative trends within the report that might suggest the emergence of a ‘two speed industry’ – the ‘BIM engaged’ and the ‘BIM laggards’. “For the advocates, 60% of those who have used BIM have seen improvements in efficiencies whilst 22% of those yet to use BIM have indicated they would rather not adopt it. “In addition, the demand from clients, on both private and government projects, is mixed. The survey suggests that not all clients across the industry are seeing the benefits of BIM. We would expect this to increase as BIM, defined by ISO 19650, becomes more commonplace. “Once teams have had a good experience of working collaboratively using digital processes then they will demonstrate the benefit to the client. The client will then, in turn, request that this process is followed on subsequent projects.” The 2019 NBS survey also indicates that there has been a drop-in awareness of UK Government activities in this area despite the fact that Government’s initiatives led to the ISO standards that were launched at the end of 2018. This drop could be explained by recent changes such as the replacement of the BIM Task Group by the Centre for Digital Built Britain (CDBB). It may take time to rebuild this position in the market. There are however a number of key projects underway, involving Government, industry and academia which may drive greater awareness that will be seen in the 2020 survey. Richard Waterhouse continued, “Overall, there can be no doubt that digital processes and technologies are changing the industry. “Use of the cloud is enabling collaboration, giving the industry the opportunity to break down the silos and form a new approach to information development and distribution. “In addition, the latest International Standards are giving us a once-in-a-generation opportunity to standardise processes across the global industry. This is an exciting time, and we must now take advantage of it to help create a step-change in productivity, transparency and quality within our industry. “At NBS, we have already played a significant role in the UK’s BIM journey and we will continue to do so as we move towards a global digital construction industry. “We have supported the BSI committees that have developed BIM standards, as well as supporting the BIM Task Group’s original core initiatives, where we developed, published and now maintain the Uniclass 2015 classification system, defined in the UK as the system for classifying information on  BIM projects in BS EN ISO 19650-2. “This year, our journey to support the global BIM world takes a giant leap forward as we launch a global platform for BIM-related content. “Our ground-breaking cloud specification tool, NBS Chorus, has connected specification clauses, technical guidance and manufacturer specifications for North America, the UK and Australia, dynamically linked to geometry objects and standards, technical and regulatory data. We have, and will continue to develop digital content and to enhance our software offerings to support global BIM processes” For further information about NBS and to download the report please visit https://www.thenbs.com/knowledge/national-bim-report-2019 

Read More »

How using an interior designer can make the most of your space

Beautiful spaces are carefully designed and decorated by experts to make the people who use those spaces feel relaxed, comfortable and surrounded by beauty. When you walk into an amazing hotel, or shop and are inspired by the decoration and the use of light and space that gives it personality, it is no accident. It is a feeling we often seek to replicate in our own homes. To create a place of beauty, that also reflects our personality while still being able to use it in a practical way with our family. This is more difficult than you might think, and to really get the look you want the only way is to hire a professional interior designer. A way to express yourself in the home around you You might be worried that by hiring a professional interior designer, that the finished space will lose some of the sense of your personality and likes, and start to reflect more the style of the designer themselves. This will not happen with a good designer. They will gently influence, after all with the experience they will know how to make the best use of light, and how to design a complementary colour palette, but this is all meant to enrich and enhance your own preferences. The customer comes first, and this means embracing your individuality in their designs and to ensure every step of the way that your expectations will be met. Most who use the services of a designer often find that the designer is able to suggest ways to represent your styles in a manner that you would likely never have thought of. Consider a designer like a specialist advisor and coordinator of your project. They will bring all their expertise to bear in what the latest trends are in the market, modern decoration and refurbishment techniques, how to be more sustainable and environmentally friendly and also how to make sure a space is practical for family life as well as beautiful. This advice and guidance is priceless. Getting help with a refurbishment project can save you time and money The big transformation of your house can be very complicated. It is not just the aesthetics, but the practical building work as well. Bringing together multiple workmen and suppliers and ensuring the overall vision and plan is followed can be quite daunting without the help of a project manager.Costs and delays can quickly turn the whole thing into a nightmare. This is why it is better to work with someone who can manage this for you, with consultancy, planning and also the execution of those plans. You also need someone who can find local, reliable quality workmen. Access to the best contacts and suppliers in the business When you work with an expert – like those at www.katrin-ackfeld-interior-mallorca.com, you know that you are getting the best in the business. With 29 years experience in interior design, and 14 years experience in refurbishment and construction, you know that they will be able to connect with the most specialist craftsmen and suppliers available, both on the island of Mallorca and all around the work. If you are looking to renovate your living space on Mallorca, and do not speak the local language, then this can be incredibly challenging and make it impossible to get what you need done. You also need to have knowledge of the local laws and regulation in terms of contracts and renovations, but someone with 20 years experience in Mallorca, that speaks three languages will be able to take care of all of this for you, and take much of the worry out of the works. You can have peace of mind, and just watch it all come together around you, then simply do what is meant to be done and enjoy your new space.

Read More »
Entry now open for the PPMA group industry awards 2019

Entry now open for the PPMA group industry awards 2019

The 2019 PPMA Group Industry Awards will be held at the National Conference Centre (NEC), Birmingham, on the evening of the first day of the PPMA Total Show 2019 – Tuesday, 1 October 2019. Award entry submissions are FREE and now open to all PPMA Group members (PPMA, BARA and UKIVA) and others involved in the industry. The deadline for submissions is 17 July 2019. Now in its eighth year, the PPMA Group Industry Awards 2019 brings together more than 300 industry professionals and stakeholders to celebrate the finest examples of innovation, smart manufacturing and entrepreneurship. There are 12 Awards categories, ranging from most innovative technologies in processing, packaging, robotics, vision systems and ancillary equipment, to achievements in sales, export and the environment. The ‘Apprentice of the Year’ Award serves to acknowledge the most promising young talent within the processing and packaging, robotics and automation and industrial vision industries. Companies that have developed a comprehensive apprenticeship or training programme have the opportunity to be recognised too through the PPMA BEST Award. All entries will be judged by a panel of eight independent industry experts, including academia, end-users, editors and engineers. This year’s Awards, featuring a three-course gala dinner, will be hosted by UK television presenter and magician, Stephen Mulhern, who has appeared as host on Britain’s Got Talent, Catchphrase and Big Star’s Little Star. For further information on the Awards and details on how to enter, visit: https://www.ppmatotalshow.co.uk/awards/ppma-group-industry-awards. Notes to Editor: The PPMA Group Industry Awards 2019 The PPMA Group Industry Awards are organised by the Processing and Packaging Machinery Association (PPMA).  https://www.ppmatotalshow.co.uk/awards/ppma-group-industry-awards. About the PPMA Group The PPMA Group of Associations comprises the Processing and Packaging Machinery Association (PPMA), British Automation & Robot Association (BARA) and UK Industrial Vision Association (UKIVA). Its mission is to actively help its 550-plus members through services, tools and initiatives to thrive in an increasingly competitive marketplace. Its PPMA Show and PPMA Total Show exhibitions are hailed as the UK’s unmissable, free-to-attend, processing and packaging machinery events. In 2017, the Group also launched the first UKIVA, Machine Vision Conference and Exhibition, which is now in its third year. More information of all of these events can be found on: www.ppma.co.uk Building, Design and Construction Magazine | The Choice of Industry Professionals

Read More »

Fall protection cost-cutting: a step too far?

Any work at height carries risk. Preventing accidents from falls relies on all stakeholders using an informed, joined-up approach to practices and systems. Specifiers, contractors, system installers and end-users all play a part in risk mitigation. James Sainsbury, Fall Protection Sales leader for MSA Safety, explains why a holistic approach to safety is needed, and highlights the potential risks of making ill-informed changes to a defined safety system specification. Gravity is a an ever-present force. It doesn’t offer second chances. And however diligent safety planning and preparations may be, a fall is always a possibility. With workers’ lives at stake, there’s simply no excuse for inadequate fall protection systems and personal safety equipment. Accident prevention: the UK picture Despite the fact that almost all falls from height can be prevented, it’s a sobering reminder that they still remain the leading cause of workplace fatalities. The most recent Health and Safety Executive (HSE) statistics show that in 2017 alone, falls accounted for 28% of all UK fatalities in the workplace. Digging deeper, between 2013/14 and 2017/18, falls from a height accounted for more than a quarter of all fatal injuries to workers. That’s an average of 37 deaths a year. In addition, a staggering 43,000 non-fatal accidents involved falls from height too. Over 60% of deaths when working at height involve falls from ladders, scaffolds, working platforms and roof edges and through fragile roofs. It’s no wonder that HSE research has also revealed 19% of people think their health and safety is at risk at work (2010). Whilst the UK, like much of Europe, is a mature market, with comprehensive regulatory standards for safety systems and practices, there is still much room for improvement. Setting realistic safety system budgets, honouring specifications, understanding the suitability and quality of different equipment, accurately assessing risk and training users to be competent are all on the agenda. Creating the plan: specifiers As the first link in the chain of creating safer working at height, the value of consulting specifier professionals cannot be overstated. The decisions, assessments and recommendations they provide result in the most appropriate fall protection system specification for the building at the outset: one that will maximise protection for users and allow work at height to be carried out more safely and efficiently. A system specification can be defined by architects, consultants or engineers, or by safety system industry professionals, such as professional installers. A thorough specification takes account of both the unique risks posed by the structure and the practical access requirements needed for safe works. It will also mean full compliance with all local and national health and safety and regulatory conditions. Manufacturers, too, can provide consultation and system design, helping to make sure that the very best equipment and system is installed. Controlling the project: contractors One of the most important elements of the specification – at least for contractors – is the independently-calculated budget allowance required to procure and install the recommended system. Unfortunately, specification-switching down-the-line by UK contractors seeking to reduce costs can be problematic. This worrying trend has the potential to put workers’ lives at risk. Simply changing or substituting elements for alternatives that are perceived as less costly can be short sighted and dangerous. Any specified system for working at height, and any attendant cost, is usually proposed for sound safety reasons. High-quality equipment benefits from advanced engineering and rigorous testing, both of which contribute to full compliance and reliable performance. Lesser products may wear, degrade or fail more quickly, requiring premature replacement and increasing Total Cost of Ownership. When equipment is well designed and easy to use, the risks of equipment failure are naturally lower. Putting it all in place: Installers The performance and safety of fall protection equipment depends on correct installation, testing and commissioning. Quality installers have a responsibility to check that only technically-competent professionals install equipment. Leading companies are fully familiar with the leading manufacturer systems, are usually accredited, and will have undergone specialist training to be certain systems are installed exactly in accordance with the manufacturer’s guidelines, including all compliance checks at sign-off. Once equipment is installed, the installer will be responsible for commissioning, testing and ongoing maintenance and, in some cases, arranging user training. Experienced installers are also used to quickly overcoming any unexpected challenges a building may pose – for example, undertaking a retrofit system installation within an older or historic building. They will also spot and highlight any new risks or findings that may impact the effectiveness of the fall protection system. Confident and capable: end users There’s no value in provisioning fall protection equipment if workers are unable, or are unwilling, to use it properly. Whilst overseeing safety, risk assessments and method statements for those that work at height falls to the site manager and/or health and safety officer, all equipment users should be ‘competent persons’. That means expert PPE and or fall equipment system training from a qualified provider. Can users check equipment before use? Do they know when and how to use it correctly? Do they possess the expertise and confidence to make the right decisions at the right time? Can they execute an agreed rescue plan if needed? Safety and accountability: inextricably linked If UK working at height safety statistics are to improve, the sequential chain from specifier through to user requires close scrutiny. At every stage each party has a duty of care to respect the integrity of what should remain an optimal safety system. Specification-switching and making arbitrary changes to carefully chosen solutions may have serious implications. Equally, users deserve to feel confident using systems, and must be supported with quality training and rigorous equipment checks. Most falls from height are preventable. All parties engaged in fall protection should be aligned and accountable to keeping workers safe.

Read More »

Tips to ensure safe industrial dust collector operation

Industrial plant personnel will need the help of industrial dust collectors to ensure that employees and the working environment is safe for general working conditions and to meet policies set by the regulating bodies. These devices can be quite pricey thus it makes it a prime concern for most businesses to take care of them to avoid any unnecessary part replacements. This article will present some tips to make sure that the industrial dust collector is operating at top safety performance level. Use deflagration Protection There are times wherein a dust collector handles dust that may combust. In cases such as this the industrial dust collector must be equipped with deflagration protection. A common, inexpensive and passive method is by use of venting. When predetermined pressures are reached inside the collector, an explosion vent opens which will then allow the extra pressure and fireball from the deflagration to exit to an area that will not disrupt operations nor will damage any devices. There exists flameless vent which consists of a casing that will include a panel of a mesh that can withstand high temperatures while also absorbing heat and flame. The way it will be used is by installing it over a standard explosion vent. Whenever a combustion happens, the vent will open while lowering the pressure and direct the fireball into the casing mentioned earlier. There will also be mesh layers whose job is to absorb the heat and flame while and then allowing a bigger portion of the pressure wave to pass easily towards a safe zone outside the working environment. The mechanism will allow venting in the conventional sense to be completed indoors. Otherwise, it may be able to endanger staff or add unpredictable secondary explosions. It is worth noting however that there are indeed other protection devices that currently exist in the market. Ultimately, the best recourse may be to work with your industrial dust collector expert or representative to search the best that fit your requirements. Study capabilities of your collector It is vital for plant staff to be able to understanding the levels of pressure that the industrial dust collector is capable of. Other important decisions that should be pondered upon are the specification and selection of vent sizing. By comparing these venting vessel sturdiness and matching it to the deflagration strength and vent burst pressure you will be able to effectively protect your industrial dust collectors from deflagration. Check the ductwork Fire protection agencies around the world will often have the same opinion. They will require that should be protection for all the ductwork and the safety processes upstream of the industrial dust collector. Configure the ducting in such a way that it will be equipped with a flow-activated isolation valve that will then function as a protection of downstream work areas and processes. It will be protected from the propagation of flames and the excess pressure ported from inlet duct when deflagration occurs in a dust industrial dust collector. During the occurrence of such deflagration, the pressure wave will shut the valve off which will then prevent any passage of fires, flames, and smoke up to areas far upstream from the valve. In this case, the valve will then latch shut and can only be manually opened. If the mechanism is activated, there will be components in the valve which can be damaged and only with a thorough inspection can suffice before returning the valve back into service. The hoppers should not be used to collect dust A rookie mistake that can be often done by most that are starting out in manufacturing is the use of hoppers as a means to store dust. It should be understood that the hopper’s sole purpose is for funnelling process dust towards the storage bins. The dust that would soon fill up the hopper will surely create a potential fire or deflagration risk. Another point to remember is that the dust in the hopper can also deflate the industrial dust collector’s performance by obstructing the system and preventing the pulse-cleaning from completing the task it was intended to. The self-dumping hoppers can be an easy dust disposal mechanism all the while protecting against unwanted dust leaks among the collector and hoppers. Pulse-cleaning controls is an option The industrial dust collector’s system for cleaning is designed to work in hand in hand with filter design. There are some cleaning controls that can provide an easy way to keep filters clean without the added hassle of having to maintain it on a daily basis. The continuous cleaning option can be used for the porous kind of dusts, that may included silica and other minerals, high dust loading applications like thermal spray or plasma cutting, or some of the lighter ones such as paper fines and fumed silica. There are also on-demand cleaning which are recommended for almost all of the dust types. There is a setting monitor that causes a difference in pressure from the clean-air section all the way to the dirty-air filter section of the collector. This will allow the operator to set a small range of pressures to be used and pause the cleaning of the cartridge. This setting can also use the smallest amount of pressurized air and can afford you the optimum filter cleaning efficiency and will allow the filter to last longer than usual. When all else fails, you can opt for down time cleaning which can allow for pulsing at timed intervals at the end of each operational sting. This can also be done after completing a batch process or after an disruption in the system that may diminish the performance of the filters. After the period, the unit can now be turned off completely. This is a vital capability because cleaning cartridges beyond what is necessary, especially during operation can not only cause higher emissions but can also shorten the life of the cartridges and force you to spend more on energy simply because of overusing of the

Read More »

5 Guidelines to Write the Best Dissertation

Doctoral students need substantial research which is a piece of document in order to get doctoral students. When it comes to writing the dissertation, many students fail to complete it because of not being able to give enough time. However, it is not difficult to write a dissertation if the student chooses the right topic and strategy. In some countries, thesis and dissertation are interchangeable whereas, in some countries, thesis work is done after a master’s degree and dissertation after graduation. The dissertation is no doubt a most important part of the entire educational career of the student. It is the last stage of the educational career and has a lot of academic value. Most of the students fail to give their best in dissertation work and become completely disappointed. There are many complex and hard challenges that a student comes across and loses his enthusiasm with which he starts working on the dissertation The key to writing an effective dissertation is to get the right direction to focus and accelerate. Here are a few guidelines to help you get started with the dissertation writing service UK without any problem. 1.  Make a timetable to follow: As a matter of fact, writing the dissertation comes with very limited time. Most of the students face the problem of the limited time period. Therefore, it is required by all the students to keep their speed of dissertation fast so that they can write in time. The best to do this is to assign yourself a deadline for completing a specific portion of the dissertation. Try to figure out how much work you are needed to do each day to reach your goals. Assign several hours to yourself; you are capable of working in order to write a dissertation. Make a timetable and stick to it. 2.  Structure your dissertation task properly: In order to write the dissertation well, you need to know how to format and structure your task. There are certain components of the dissertation which need to be understood. Every component of this document has a specific place in the document. For example, the objectives of writing the dissertation can never be written after specifying the methodology. As a dissertation writer, you should know which detail to add where. In general, the components are added in the following sequence Title Objectives of the dissertation Research to be conducted Strategies Potential expected results Timeframe References from where the data has been collected 3.  Edit the language of the dissertation properly: Generally, the students are asked to write their dissertation in the English language all across the world. Those students really face problem in writing the dissertation in English if their native language is not English. In such a situation, there are two things you can do: Search for a fellow student in the class whose native language is English. You can ask your fellow to read the document carefully and point out any grammatical and spelling mistakes in the document. If that native speaker is your friends, you are going to get it done very easily Another option for you is to get the paid editor who will do the job of editing the dissertation to make it free from the spelling and grammatical mistakes. There are many professional editors who are willing to provide their services. Make sure that the editor you have chosen is a native English speaker who can do this job easily Another option is to avail the dissertation writing service in the UK that writes the dissertation document for the students facing different types of problems in terms of writing, researching, resourcing, etc. 4.  Get regular feedback: As a student, you must be working under somebody’s supervision. In many universities, the supervisors are appointed to guide the students. It is advisable to share your work with your supervisor after regular interval of time. This will help you get the necessary feedback from them sooner. It will be easier for you to remove the mistakes from the dissertation document which have pointed out by the supervisor if you do it early. The revision one along the way also saves you from the revisions at the end which are very time consuming and hectic. 5.  Conduct comprehensive research: Researching is a major part of writing the dissertation document. You will never be able to write the dissertation document in time if you don’t consult right and relevant sources for information. It is always advisable to find several resources from where you can collect data for your dissertation. While adding the researched content into your work, make sure that the content you have added is relevant to the topic on which you are conducting the research. Also, check the previous research on the same topic to know who to make your dissertation a difficult piece of article.

Read More »

When Will LEED V4.1 Be Featured In LEED Credentialing Exams?

The world’s most widely used green building rating system, LEED, is getting updated to improve building performance and to integrate the latest reference standards. The current LEED rating system, which is LEED v4, was launched at the Greenbuild International Conference and Expo in Philadelphia on November 20, 2013. Over the last years, the U.S. Green Building Council (USGBC) was working on the LEED rating system to integrate the lessons learned from the green building projects. With LEED v4.1, the green building projects will be able to make a bigger contribution to reducing the global climate change, improve building performance, as well as expanding activities that positively impact human health and well-being. On March 2018, registration for the beta version of the LEED Operations and Maintenance (LEED O+M) rating system was launched. As of January 2019, the registration is open for the LEED Building Design + Construction (LEED BD+C) and the LEED Interior Design + Construction (LEED ID+C) LEED v4.1 beta rating systems. The beta versions will be available throughout 2019 and with the feedback received from the green building projects that pursue LEED v4.1, the updated rating system will be launched after public commenting and the approval phase. People that are planning to take LEED exams are also curious about this change and want to know when the LEED credentialing exams will be effected with this change. The LEED credentialing exams like LEED Green Associate or LEED AP BD+C, will be untouched throughout the 2019 and continue to be based on LEED v4. Once the beta rating system launches on 2020, the U.S. Green Building Council will start updating the LEED exams to reflect the LEED v4.1 with a prior notice. Even though the exact dates are not yet announced by USGBC, the LEED exams will be based on the LEED 4.1 version by the end of June 2020. The current beta rating systems are not yet finalized and will definitely see some revisions. With those revisions, the USGBC will start updating the LEED reference guides which will include the finalized v4.1 rating system. At that point, the LEED credentialing exams will be updated with a prior notice. USGBC will allow for a specific period of time for test-takers to take the LEED v4 exam as they had started their studies while the LEED v4.1 was still in beta. During this time frame, LEED exam prep providers (like us) will also be able to update their LEED courses, LEED practice tests, and study guides. What’s New in LEED v4.1? First of all, LEED v4.1 is not a full version change, rather it is a critical update to reflect the lessons learned from the LEED v4 rating systems. For LEED BD+C projects, there are some revisions on credit requirements to streamline the certification process, and credits like Low-Emitting Materials, Daylight, Rainwater, and Heat Island Reduction are more impacted with this change. The credits that were tested through the LEED Pilot Credit Library are expected to become actual credits in the newer rating system. The performance thresholds of some credits have been updated to be more straightforward. Additionally, with LEED v4.1, the international projects will have easier time achieveing the LEED certification as it will contain more options on complying with the project’s local standards. From the beta version we can also say that not all of the prerequisites and credits are impacted with this change. Approximately one-third of all the LEED BD+C prerequisites and credits are expected to stay as is. In summary, with these revions we can say that LEED v4.1 will be more performance based and is more focused on implementation. LEEDUCATE Inc. | LEED Exam Prep Provider

Read More »

WORK TO COMMENCE ON BELFAST’S MOST EXCLUSIVE NEW BUSINESS ADDRESS

TODD Architects is pleased to report that construction work is about to commence on The Mercantile office development in Belfast following approval by Belfast City Council. This landmark office building is located on a prime commercial site within the main public square and civic space in Belfast City Centre directly to the rear of City Hall. TODD Architects were delighted to be appointed by Killultagh Estates when this property initially came to the market and was ultimately secured through development feasibility and financial offer. The design development was not without its challenges along the way but has resulted in a planning approval for 95,000sq ft of development over nine floors together with a basement. “We are delighted to have appointed TODD Architects to have the pivotal role within our creative team behind The Mercantile. This is a key development for us and demonstrates our commitment to the City where we see this development as a rebirth of one of Belfast’s foremost business locations overlooking the magnificent City Hall.” – Laura McCarthy, Senior Asset Manager; Killultagh Estates The architectural approach is contemporary but respectful of context, utilising cut stonework and ‘bronze’ anodised aluminium to articulate the verticality. It is anticipated that the Ground Floor and Basement will be occupied by restaurant or leisure uses to provide ‘activity’ at street level, with the upper levels providing high-quality and flexible office space capable of a variety of fit-out and workplace permutations and bespoke solutions accessed via a double-height corporate foyer. The Donegall Square South façade is primarily glazed with three projecting bays providing good daylight quality and outlook. The floorplates start to set back to reflect the notional ‘shoulder’ height adopted around the Donegall Square area providing accessible roof terraces looking across the wider city centre area. The demolition of the existing building is underway with construction of the new building due to complete in Quarter 3 of 2020.

Read More »

Major Edinburgh Development Approved by Local Council

IMPORTANT plans for the future supply of homes in Edinburgh have been given the go-ahead by Councillors at a hearing on the 22 MAY 2019. The 655-home development at Cammo Estate is a consortium project by CALA Homes and David Wilson Homes and includes 164 much-needed affordable homes. The development will provide a unique mix of 1, 2 and 3 bedroom apartments, terraced homes, colonies as well as detached family homes. A spokesperson on behalf of the consortium, said: “We must thank the local community first and foremost for engaging with us throughout, helping us to shape the final proposals which have evolved over the past two years. “We fully understand how important the junctions at Maybury and Barnton are and traffic was a key concern for many people at the outset. “We feel the improvements made through Planning Gain contributions will benefit the wider community and those commuting in or out the city. “Following yesterday’s decision our focus now turns to assisting the City of Edinburgh Council to ensure a timely delivery of these improvements” A key component of the site is the extent of publicly accessible green space – which totals over a third of the entire development and includes linear parks, a seven-hectare park, and over 700 new specimen trees. In addition, a half kilometre 20-metre wide green corridor at Maybury Avenue will feature a much-needed cycle and footpath detached from Maybury Road. Further improvements to the walking and cycling network will be made from Planning Gain contributions the developments will make. In line with the Local Development Plan these routes will connect to the land at West Craigs, and as part of that development connect onwards to the Gyle and Edinburgh Park. The spokesperson added: “At the heart of the design solution has been the delivery of an outstanding landscape environment along with significant investment to improve public transport, education and health care and the delivery of an excellent pedestrian and cycle network. “Within the development site we will deliver new bus infrastructure in addition to making contributions to public transport connections to the site. “In addition, there is an exceptionally wide range of homes that will help to ease the supply shortfall that features throughout the market.” As part of the 655 homes, 25% of the development units will be of affordable tenure delivered with our Registered Social Landlord partner; comprising a wide range of 1, 2 and 3 bedroom apartments and terraced homes. The affordable housing will commence as part of the initial phase of development.  

Read More »