Kenneth Booth

Innovative £320k development aids pupil’s wellbeing

Schoolchildren in Cheshire are enjoying a renewed sense of health and wellbeing, following a ground-breaking project at Alsager School. The £320k development has provided students with space to enjoy the fresh air – whatever the weather. Tasked with overseeing the design, build and installation of a sleek new ETFE canopy

Read More »

£40m Great Yarmouth flood defence upgrade set to start

Tidal defences in Great Yarmouth are set to receive a £40.3 million refurbishment, upgrading the level of protection from tidal flooding to more than 4,500 homes and businesses in the area. Nearly 4km of flood walls will be improved and updated as part of the project which will better protect

Read More »

Willmott Dixon awards REL £1.9m M&E contract

Willmott Dixon has selected REL Building Services to deliver the M&E package for a new £12m facility at the University of Hertfordshire. Part-funded by the Hertfordshire Local Enterprise Partnership (LEP), the three-storey ‘Business Hub’ is due to be completed in 2020. Designed by Bond Bryan, it will bring business incubator,

Read More »

Heating and Plumbing Solutions for your Bathroom

When it comes to thinking about adding new or updating existing heating and plumbing systems, we realise it requires a lot of thought as often these can use a substantial amount of your home renovations budget. Choosing the right heating system is crucial to creating a comfortable and efficient home

Read More »

Considerate Constructors Scheme expands to offer registration to professional services Professional service organisations can now demonstrate their considerate credentials

The Considerate Constructors Scheme – the organisation established to improve the image of construction – has expanded to offer professional service organisations the opportunity to register with the Scheme. Eligible organisations providing professional services to the construction industry, such as architects, engineering consultancies, surveyors, accountants and lawyers, are now able

Read More »

Take advantage of controlled bolting techniques

For all operations, controlled bolting is highly important. It ensures that the tightening and loosening of bolts are done in a controlled manner. If you rush through this process, then you could risk complications further down the line. If you correctly use a controlled bolting technique, then it can help

Read More »
Latest Issue
Issue 345 : Oct 2026

Kenneth Booth

Removal of industrial machinery is no easy task without the help of an expert

Planning the removal or relocation of heavy industrial machinery can be a daunting prospect. It is not just the dismantling and reinstallation, but the logistics of the entire project, including transportation, that is difficult to coordinate. Added to the challenge is the knowledge that every single day the machinery is not in operation for its intended purpose is a day that the business is losing production time and therefore revenue. It stands to reason that the best course of action is to hire an expert to deliver this tricky piece of work for you, and here are some things to consider when choosing whose services to procure. Using a single provider reduces risk to your project The removal, transportation and installation of heavy industrial machinery is no easy task. It has not been unusual in the past for companies to hire several different providers to cover each part of the process, even for a single project. This was simply because it was virtually impossible to find a company that could safely, and expertly cover all aspects of machinery removals, covering only perhaps part of the process. This coordination of multiple suppliers in a project is a nightmare, and introduces a lot of additional moving parts and risk to project timelines that is completely unnecessary. Nowadays it is entirely possible to hire a company that can cover everything, from mechanics, electricity, electronics, pneumatics, hydraulics, plumbing, welding and cutting of structures, movement to loading, transport and start-up for any industry sector. Hire a company that values training its workforce Of course if you are trusting a single vendor to provide all of the services in relation to industrial machinery removal and installation, you need to be able to trust in their expertise. As part of your vetting procedures and due diligence during contract negotiation it is very important to look at how professional and well trained the staff are, and make sure they are trained to an adequate level to fulfil any quality standards you need. You want someone who has years of experience in the industry too. After all every project will be completely unique in almost every respects, so you need enough experience to be able to adapt to any possible roadblock or issue encountered during the project. You also want to be sure that they can handle the scale of the project, whether large or small, and that they have the equipment and resources available to deliver what you need, on time and to the highest standards. Finally safety standards are also incredibly imports, especially when it comes to operation and set up of industrial machinery. You should be looking for a zero-incidents orientated provider.   Innovation and flexibility is key to success As previously mentioned, no two removal or relocation of industrial machinery will be the same. Not only should a services provider have years of experience, but you also need them to be flexible and innovative – able to come up with ingenious solutions to a multitude of problems they could encounter along the way. They also need to be flexible to moulding to what your business needs operationally, and be sensitive to production lines. You want a company with access to sophisticated tools, a highly trained workforce, and be able to offer a complete service that lives up to your expectations. After all you need to be up and running as quickly as possible. Ultimately you need to choose someone who puts the customer first in their delivery, and can offer administrative, logistical and technical personnel and guidance at each stage of the project from start to finish.

Read More »

What Can We Expect From the Construction Technology in Near Future?

The world has become a very competitive place for companies in every industry. Construction companies cannot compete with price, so they must find a way to lower their costs and inefficiencies. Leading companies from all over the world push the boundaries of technology solutions, in order to make their work more efficient as well as reduce expenses. The key elements for standing out in the construction business are innovations in construction technology. The other problem that they face is the lack of knowledge in that sector as the experienced professionals start to retire. The safety of the workers is also a crucial part of using innovative technology in this business. Furthermore, we will discuss some of the innovations that are coming to the construction business. The Internet of Things (IoT) As the world is going forward, many of the sectors must follow the path in order to survive. The construction business can be improved a lot if we use data-driven technology. This will enable every company to be more efficient and precise. Internet of Things means that the business will be followed, analyzed, and improved using the technology from today. Embedded sensors on a connected worksite can create huge possibilities and improvements by collecting and managing data, performance, workflow and so on. Smart devices that will be wearable in the construction business will be everywhere analyzing every worker and position in the company. The innovations in the construction technology will bring us the whole system connected together such as cameras, sensors, etc. communicating with one another with the opportunity to improve the results. AI and Machine Learning Artificial Intelligence is the world’s number one trend for the future. People are expecting to bring machine brain into the industry which will have a big impact on the work. Robotics combined with Artificial Intelligence defines the process of Machine Learning. In order to have faster, more efficient and precise results, people in every industry are going to be replaced with machines that are capable of completing the work. Some of the innovations are already here such as the Smartvid.io which aggregates visual information from the cameras placed on the workplace and using artificial intelligence can detect potential hazards and safety violations. With this, we just scratched the service of the technology. AI has enormous potential that will have a positive outcome when it will be used in the construction business. Predictive Analytics Predictive analytics is the new trend that combines statistic, modeling, machine learning, AI and data mining. This innovative technology can point out any safety concerns and provide us with budget outlooks, more innovations, and increased development. This method is so sophisticated that can predict opportunities, anticipate problems, and help managers for their decisions. It is already used in tennis betting and other kind of gambling industries as well as by sports pundits and managers. Predictive Analytics can be used in the construction business as well, as a new way of problem-solving with the use of data and predicting patterns in the workflow. Virtual Reality (VR) / Augmented Reality (AR) Virtual Reality is not designed just for games. Actually, alongside with Augmenter Reality, it can provide incredible support to the construction business. Both AR and VR technology can provide real-time 3D models to physical spaces. This will provide more precise projects as well as testing them into the real world with the AR technology. The special awareness of the workers can be improved with VR/AR as well as providing a real-time construction idea in the real world. People will be able to design a building or a room only with their VR headset. Autonomous Equipment Actually, this technology is already available and is widely used in the automotive industry. Robotics can provide greater efficiency as well as safety. Nowadays, the use of drones in construction is massive, providing valuable information that was out of reach for humans a couple of years ago. For example, the drone can generate a 3D model of a building by calculating the area through GPS in minutes, calculate the volume of earth that needs to be moved and much more. Construction business is all about reducing costs. Only that way you can stay competitive and increase your earnings. Costs can be reduced by efficiency and error-free workplace, and the only way you can create that environment is by using autonomous equipment in construction. These are some of the innovations in the construction business that will ensure a more stable, easier and safer future. The technology can be used in every industry, we just have to use our imagination and improve constantly. We will see what improvements will the future bring to the construction technology in business. Author: Mario Petkovski

Read More »

Innovative £320k development aids pupil’s wellbeing

Schoolchildren in Cheshire are enjoying a renewed sense of health and wellbeing, following a ground-breaking project at Alsager School. The £320k development has provided students with space to enjoy the fresh air – whatever the weather. Tasked with overseeing the design, build and installation of a sleek new ETFE canopy to enclose what was previously an open courtyard, Access North Build has made waves within the education sector with its industry-first solution. Yorkshire-headquartered Access North Build designed, developed and installed a pioneering solution, a lightweight steel space frame – the first of its kind supporting an ETFE membrane in the UK – erected to span the quad, thus enclosing the area beneath. Alsager School site manager, Matt Harris, explained: “Fresh air plays a pivotal part in the wellbeing and health of people of all ages. Creating a space which allows students to ‘go outside’ while providing protection from the elements – including rain and solar shielding – is key to supporting their development.” Engineered to carry more weight over a greater area – in order to provide plenty of natural light and promote student wellbeing – the greatest challenge was the location and layout of the outdoor space, which was enclosed by existing buildings on all sides. As a result, the superstructure – which is over 400 square feet in size – had to be assembled in the school car park before being carefully manoeuvred over the establishment and precisely into position on the pre-installed locating bolts. Access North Group managing director, Berenice Northcott added: “This type of ETFE enclosure provides an extremely beneficial space for organisations within the education sector where student wellbeing is crucial. Additionally, the new ETFE canopy has a design life of 70 years providing it is regularly maintained, but if the time comes when it is no longer required, the ETFE membrane and steel space frame are recyclable, extending the environmental-friendliness of the build with the circular economy in mind. “We relished the challenges of this particular project. Craning a huge space frame over a school and courtyard – which was bordered on all sides – without damaging buildings or people, was a testament to the planning, organisation and attention to detail of the team. The new roof has transformed a previously under-utilised area into a light and airy multifunctional space, resulting in a positive impact on staff and pupils.”

Read More »

£40m Great Yarmouth flood defence upgrade set to start

Tidal defences in Great Yarmouth are set to receive a £40.3 million refurbishment, upgrading the level of protection from tidal flooding to more than 4,500 homes and businesses in the area. Nearly 4km of flood walls will be improved and updated as part of the project which will better protect the local community from the threat of east coast flooding. Great Yarmouth has a history of flooding. During the 1953 east coast tidal surge, the tidal river defences in the town were breached in several places resulting in loss of life. More recently, in December 2013, approximately 9,000 people were urged to evacuate their homes as a result of the highest ever recorded tide in Great Yarmouth. The work will see 46 flood defence walls refurbished at locations across the town using an innovative technique that will extend their lifespan by up to 30 years. It follows on from the initial five-year phase of work which included the use of a specialised dam, known as a limpet dam, to inspect and repair the steel sheet piles that form the flood walls in a dry environment that would otherwise be underwater. Funding is now in place for the next phase of the multi-partner project, which is being led by the Environment Agency and due to start later this year. The £40.3 million investment, plus £6.2 million for ongoing maintenance, has come from a range of sources including £32.4 million provided by central government. Partnership contributions have come from New Anglia Local Enterprise Partnership, £8.2 million through the Growth Deal programme, and £2.8 million from the Anglian Eastern Regional Flood & Coastal Committee. Norfolk County Council and Great Yarmouth Borough Council have also contributed towards the project and local quayside businesses are supporting through contributions and the provision of compound space.   Environment Minister Thérèse Coffey said: “I’m very pleased to see the funding is now in place for this significant improvement to Great Yarmouth’s flood defences. An extra £5.4 million of funding was added to our standard Defra grant in view of additional regeneration objectives to allow this project to proceed with important partnership funding contributions. “Over £32million from direct government investment alongside the partnership funding will ensure 4,500 homes and businesses in the area are better protected from any future tidal flooding.”    Sir James Bevan, Chief Executive of the Environment Agency said: “We have worked very closely with our partners to enable this important project to go ahead. The upgraded defences will ensure that the flood defences in Great Yarmouth provide the best standard of protection to the local community for many decades to come. “We are currently consulting on our Flood and Coastal Erosion Risk Management Strategy and this project is a perfect example of some of the ways in which, by working together, we can make communities more resilient for the future.” The first five-year phase of works to replace more than 500 metres of tidal defences was completed in early 2017. The next phase of works is being delivered by the Environment Agency’s contractor JBA-Bentley. Preliminary work for this new phase of improvements began in February. A public drop-in event is being held on 13 June, 2019 at the Kingsgate Community Church, Kings Centre, 30 Queen Anne’s Road, Great Yarmouth, NR31 0LE. The session, which runs from 2pm and 7pm, will offer people the chance to find out more about the project and the partners involved. Cllr Carl Smith, leader of Great Yarmouth Borough Council, said: “The River Yare Tidal Defences are a huge benefit to everyone who lives in, works in and visits our borough, reducing flood risk to our homes, workplaces, and the highways and other vital infrastructure that we use every day, better protecting communities and helping the borough to realise its full economic potential. “Together with the Environment Agency and local businesses, the borough council has played an instrumental role over the years in securing this crucial and most welcome investment from multiple sources, helping with lobbying and developing the robust business case. I’m pleased that work will soon be getting underway on the second phase.” Chair of the Anglia Eastern RFCC, Paul Hayden OBE, said: “Members visited Great Yarmouth both to see the great work that has already been completed on flood defences in the town, and to show their support for partners working together to deliver these vital further improvements. “Our £2.8m contribution to these works comes from a Local Levy collected across Norfolk, Suffolk, Essex, Southend and Thurrock, and this investment is a demonstration of our commitment to protecting homes, jobs and businesses, and in encouraging further economic investment in the town.” Doug Field, chair of New Anglia Local Enterprise Partnership, said: “This project is a great example of how partnership working can deliver projects which have a real impact on our people, places and economy. “Great Yarmouth is a vital part of our all-energy coast. It sits at the centre of the world’s largest market for offshore wind and is of huge strategic importance to our region. “By protecting homes and businesses and creating a safe environment for more to be created, these sea defences will allow the town to reach its potential as a key contributor to our economy.”   Cllr Andrew Proctor, Leader of Norfolk County Council said: “This refurbishment work will help to safeguard the future prosperity of Great Yarmouth. This is an important funding partnership which we are happy to support.” The Environment Agency has been leading a conversation with people and organisations who are affected by or work to manage flooding and coastal change. We are now consulting on a draft strategy, which sets out a vision for a nation ready for, and resilient to, flooding and coastal change up to 2100.

Read More »

LINCOLN STUDENTS GET CONFIDENT WITH COLOUR AT BELL DECORATING ACADEMY THANKS TO CROWN PAINTS

Working in collaboration with Bell Decorating Group, Crown Paints marked the launch of the first Bell Decorating Academy in Lincoln with a morning of workshops for the students of Lincoln College. The workshops were hosted in the recently-opened Decorating Academy, which was created by Bell Decorating Group in partnership with Crown Paints, and took place on 3rd April 2019 at Lincoln College. Representatives from Bell Decorating Group and Crown Paints were on hand to answer any questions the students had. Alongside Bell Decorating Group CEO, Craig Bell, Crown’s contractor/specification sales manager for the central east region, Paul Burton, and Dave Hooper, regional sales manager central east attended the full session. As part of the event, 27 full-time learners from the college’s painting and decorating courses had the opportunity to learn more about how to choose colour and the factors that play into it from Crown Paints’ colour consultant Jemma Saunders. Apprentice Decorator of the Year judge Kevin O’Donnell was also on hand to provide a demonstration of paint application, showing the benefits of Crown Trade primers, the Fastflow system and Clean Extreme and provided hints and tips. Crown also donated products for the students to practice with after. Paul Wilcockson, lecturer at Lincoln College, said: “The session gave our learners a real insight into what painting and decorating is all about in the real world. The event created a real impression upon them afterwards, and our full-time learners seemed to be very motivated and keen to progress with their tasks following the workshops.” Crown Paints’ colour consultant, Jemma, said: “We are delighted to be supporting the Bell Decorating Academy at Lincoln College, and I very much enjoyed meeting the students and encouraging them to think about how to apply their knowledge of colour to real-world situations where they might be called on to advise their clients.” Bell Decorating Group’s Les Birtles, community engagement co-ordinator said: “The Bell Decorating Academy at Lincoln College is designed to support the painting and decorating students to gain valuable knowledge and fantastic work experience placements. It’s great to work collaboratively with Crown Paints again to give the students valuable knowledge and the hands-on nature of the morning helped them to improve their skills and their employability.” For more information on Crown Paints’ specification services, please call 0330 024 0310, email info@crownpaintspec.co.uk or visit www.crownpaintspec.co.uk. You can also follow @CrownTradePaint on Twitter and Crown Paints on LinkedIn.

Read More »

Willmott Dixon awards REL £1.9m M&E contract

Willmott Dixon has selected REL Building Services to deliver the M&E package for a new £12m facility at the University of Hertfordshire. Part-funded by the Hertfordshire Local Enterprise Partnership (LEP), the three-storey ‘Business Hub’ is due to be completed in 2020. Designed by Bond Bryan, it will bring business incubator, social, and teaching facilities all under one roof. REL will be responsible for developing the M&E design to optimise performance, energy efficiency and costs. The installation of the £1.9m solution is expected to take eight months. Toby Buckley, REL’s managing director said: “This exciting educational facility incorporates teaching spaces alongside open plan collaboration spaces that will allow entrepreneurial students to mix with local businesses and hopefully develop successful business relationships. “We will be drawing on our extensive experience of both the education and commercial sectors to design and deliver an M&E package that uses the most effective technology to drive efficiencies and meet all client objectives.” The Business Hub will feature a ground floor social space, an area dedicated to business incubation, providing local entrepreneurs with access to all of the University’s facilities, and a new learning space for students. Hertfordshire LEP has invested £2.5m from the Local Growth Fund towards the construction of the building as part of its strategic priority to support business growth and innovation within the county. REL has a long-established relationship with Willmott Dixon and has worked with the contractor on several major projects, including the award-winning St Albans Museum and Art Gallery.

Read More »

Heating and Plumbing Solutions for your Bathroom

When it comes to thinking about adding new or updating existing heating and plumbing systems, we realise it requires a lot of thought as often these can use a substantial amount of your home renovations budget. Choosing the right heating system is crucial to creating a comfortable and efficient home and will be different for every property and its owners. Whether you are already homeowners or looking to become first-time buyers we have several heating and plumbing solutions that may be helpful to you. One of the most used rooms in your home is the bathroom and it is important to ensure your renovations are all in working order before even considering the design. We are stripping it back to basics in terms of things to consider for your bathroom. From hot water, leaks, corroded pipes and those consistent water bills we have put together this guide on some fantastic fixes for your bathroom and plumbing: If your hot water is in short supply If your hot water has become sparse and your relaxing showers aren’t what they used to be then you may need to replace your hot water heater. When it comes to choosing you may wish to look at both conventional and tankless models. Conventional one’s can supply multiple appliances at once which may be better suited to your property. New water heaters are more efficient and so your water bill could be considerably lower! Water leaks and corroded pipes Unfortunately, from time to time you may experience a water leak, or if you are buying an old house the pipes will often need replacing. It is important to know the age of your home as pipes should be replaced every 80 to 100 years and much less for PVC drainpipes that only last around 25 years. Replacing your plumbing pipes before they burst can save you thousands in damages. PVC piping is also popular as it costs less and can be installed much more quickly. Alternative options are conventional brass, copper or steel. If you must replace any pipes it also gives you the opportunity to place them in a different area. Plumbing fixtures are boring and outdated This could be your chance to upgrade your plumbing fixtures to newer models or invest in boiler parts such as these glow worm boiler spares for your home. Often this is an easy upgrade as many of them are inexpensive. This job can be a little more fun than other plumbing tasks as there are a variety of colours, materials and designs available when it comes to boiler spares and other fittings. So not only will they look the part, but new fixtures can also be more efficient that your old ones. Water bills draining your wallet Expensive water bills are often related to leaking fixtures. This could be down to several reasons such as, a continuously running toilet. It is important to test everything for any leaks whether they are slow or heavy. If you hear a random flushing noise coming from your toilet, it may be time to replace your fill valve and flapper. If everything has been repaired and your water bill doesn’t seem to be decreasing, then it may be worth while booking a professional to come and inspect. It’s also worth noting that low-flow showerheads and toilets help to reduce water output without sacrificing pressure and can dramatically improve usage compared to older models that may clog. Eco-friendly bathroom plumbing should not be overlooked either as it helps to cut your environmental footprint. Looking to sell your home If you are in a hurry to sell your home, then renovating your bathroom may help with a speedy sale. Investing in your bathroom can bring a huge return if you are going to spend on any home improvement prior to moving out. If you are remodelling your interior, it is also worth investing in quality tiles and upscale fixtures as a shiny new bathroom lets you up your asking price! Let us know if you have any other heating and plumbing tips for your home.

Read More »

Considerate Constructors Scheme expands to offer registration to professional services Professional service organisations can now demonstrate their considerate credentials

The Considerate Constructors Scheme – the organisation established to improve the image of construction – has expanded to offer professional service organisations the opportunity to register with the Scheme. Eligible organisations providing professional services to the construction industry, such as architects, engineering consultancies, surveyors, accountants and lawyers, are now able to join the 7,000 plus construction sites, companies, suppliers and clients of construction projects who register with the Scheme each year. Professional services account for around 11% (£186 billion) of the UK’s Gross Value Added and employ around 13% (4.6 million) of the UK’s population.* This exciting development comes at the request of those already registered with the Scheme to ensure their entire supply chain is part of the Scheme, as well as an increasing number of professional service organisations wishing to be part of the Scheme to help improve their standards in considerate construction. Edward Hardy, Chief Executive of the Considerate Constructors Scheme said: “We are delighted to welcome eligible professional service organisations to the Scheme. This is a significant development for our entire construction industry, as professional services form an integral part of the industry’s supply chain. “The impact such organisations can have in becoming part of the Considerate Constructors Scheme to improve their standards will no doubt have a significant influence on improving the overall image of our industry.” Click here to find out more and to apply to become a Scheme Registered Professional.

Read More »

Take advantage of controlled bolting techniques

For all operations, controlled bolting is highly important. It ensures that the tightening and loosening of bolts are done in a controlled manner. If you rush through this process, then you could risk complications further down the line. If you correctly use a controlled bolting technique, then it can help you meet tighter deadlines and also has a number of benefits and advantages. Together, with hydraulic torque wrench specialists, HTL Group, we cover the advantages of controlled bolting techniques: Reduces time Because controlled bolting has an automated set-up, there’s no heavy loading and manual effort required. This means that fatigue won’t set in, which in turn would lower productivity levels. Not only is the manual labour a lot more strenuous on workers, it’s also a lot more time consuming for a human to do this task. Safety Let’s not forget the safety benefits. The controlled bolting equipment in this scenario can take away any unsafe actions of manual uncontrolled tightening. This is because the equipment requires highly-skilled and trained operators who follow specific procedures. Consistency When dealing with joints which have gaskets, consistency is crucial. This is because an even and consistent compression is required so there’s no damage and so that the gasket can work effectively. Human error is one of most common cause of error in engineering. This in itself would mean the task could take a lot longer. But, controlled bolting eliminates this risk. With this bolting technique, you can feel assured that you will be correctly operating every time. This is possible thanks to skilled operators using calibrated and tested equipment and follow specific procedures. Accurate calculations can also be provided by controlled bolting, which can help give the operator the required tool setting so that usability is easier. It’s essential to bare in mind before you undergo any tightening procedures, that give the equipment a full inspection. It’s also imperative to check the lubrication of any nuts and bolts and to make sure they’re flush against the flange. Be sure to check for uneven bolt tensioning as this can result in bolts being overloaded or too loose, a gasket leakage, and less than 100% tensioning. Even though controlled bolting is more consistent, time-effective and safe, you must ensure that you’re correctly trained in the method used. Sources https://www.hiretorque.co.uk/advantages-of-controlled-bolting-techniques/ https://www.ultratorq.com/in-the-news/what-is-controlled-bolting/ https://www.ved.it/en/serraggio-controllato/

Read More »

Luxury multi-million pound apartments light up London’s skyline – thanks to Waterloo

Apartments complete with floor-to-ceiling glazing, stunning views and luxury resident facilities including a swimming pool and cinema, have sold in London. Riverlight occupies a prime central London location directly fronting the River Thames and comprises a group of six pavilions ranging from 12 to 20 storeys in height. As part of the multi-million pound project, air distribution products were supplied by expert manufacturers, Waterloo Air Products plc. Each building featured bespoke glazing and inverted balconies to increase daylight and maximise views of the river. To create the perfect living environment for new owners, Waterloo’s air terminal devices were fitted inside five of the six buildings. Waterloo delivered aesthetically-pleasing linear bar grilles which were integrated at a high level in every room. The APM plasterline grille was chosen so that the surrounding frame could be plastered into the wall with only the central core visible. Special clip fixings were developed so that the frame could be installed first. After the room was decorated, the core was then fitted. Diffusers were fed via thermally-lined plenums which were sized to give good throw patterns at various fan coil air volumes. Before the installation of any products, Waterloo created working mock-ups in the test lab to ensure perfect air performance and specified noise levels could be achieved. Waterloo’s variable ventilation controllers deliver the exact amount of air flow to enhance the luxurious feel of each of the residential and retail blocks. Once Phase One was completed, the same format was created through to the other blocks. Over the course of several months, hundreds of apartments were installed with a state-of-the-art air distribution system. As well as this, other onsite facilities, which included restaurants, a gym and virtual golf, all needed specialist air distribution. Maximising space and ensuring each grille was finished to a high specification was of paramount importance to Waterloo. Consideration had to be given to each of the separate apartment blocks and, in a bid to minimise disruption, work was carried out in organised phases. Waterloo staggered manufacture and delivery to the London site to facilitate the needs of the developer. Speaking about the project, Andrew Mildon, sales office manager at Air Systems (SW), said he enjoyed being involved. He says: “This project was really exciting. Our aim was to deliver excellent air conditioning and air distribution throughout each apartment. When one block was complete, we literally moved on to the next.” From initial design stages, developers were keen to create something truly unique within this area of London. Considering the central location, it was paramount to conjure up a unique flagship development. And it seems buyers could not wait to invest.

Read More »